Download Print this page

Hellenbrand S-12-024 Supplemental Programing & Cover Manual page 6

S-12 series

Advertisement

Page 6
Drawing No.
1
2
3
4
V3836SP-01BOARD
5
6
7
8
Not Shown
Not Shown
Refer to Control Valve Service Manual for other drawings and part numbers.
When replacing the battery, align
positives and push down to fully seat.
Battery Fully
Seated
Use Cable Tie to secure battery
pack to drive bracket when
replacing V3835.
SP Front Cover and Drive Assembly
Order No.
V3175SP-01
WS1SP FRONT COVER ASSEMBLY
V3107-01
WS1 MOTOR
V3814-01
WS1 DRIVE BRACKET SOLAR & SPRING CLIP
WS1THRU2L/2 SPPCB AC/DC REPL
V3110
WS1 DRIVE GEAR 12X36
V3109
WS1 DRIVE GEAR COVER
V3835-02
WS1SP BATTERY PACK CHARGED W/TIE
V3842
WS1SP SOLAR PANEL W/BRKT ASY
V3186
WS1 AC ADAPTER 120V-12V
V3178
WS1 Drive Back Plate
AC Adapter
Supply Voltage
Supply Frequency
Output Voltage
Output Current
Correct
Battery
Orientation
1
2
7
Valves shipped with battery not connected to
circuit board. Connect this end to circuit board.
Description
U.S.
International
120 V AC
230V AC
60 Hz
50 Hz
12 V AC
12 V AC
500 mA
500 mA
Battery replacement
is 3 volt lithium coin
cell type 2032.
4
If solar panel is
not used, connect
AC adapter.
Connect red wire from
solar panel to "+"
terminal, and white
wire to "-" terminal.
Battery
Connections
5
3
SD Manual
Quantity
1
1
1
1
3
1
1
1
1
1
8
6

Advertisement

loading

This manual is also suitable for:

S-12-032S-12-048S-12-064S-12-dmt-032