Download Print this page

Hellenbrand S-12-024 Supplemental Programing & Cover Manual page 15

S-12 series

Advertisement

Page 15
Step 7D
Step 8D
Step 9D
Solar Panel Testing Output
Step 7D - Display shows the latest
measured voltage of the battery
pack. Pressing and holding  and
 simultaneously for approximately
5 seconds will initiate a test of
voltage. (Normally this test is
automatically conducted at 12:00 am
daily.)
Press NEXT to go to Step 8D. Press
REGEN to return to previous step.
Step 8D - Display shows the daily
measured mA/hr charge of the
battery pack. An active Regen
Arrow indicates that a regeneration
cycle occurred on that day. Display
not viewed in SD control.
Press NEXT to go to Step 9D. Press
REGEN to return to previous step.
Step 9D - Display shows the present
measured charge current of the solar
panel, measured in mA. An active
Set Arrow indicates that the control
is currently determining whether to
activate the charging circuit. Active
Set and Fill Arrows indicate that the
charging circuit is currently activated.
Pushing  once temporarily turns
on the charging circuit, and activates
the SET and FILL arrows. Pushing
 temporarily turns off the charging
circuit. Display not viewed in SD
control.
Press NEXT to go to Step 10D. Press
REGEN to return to previous step.
SD Manual

Advertisement

loading

This manual is also suitable for:

S-12-032S-12-048S-12-064S-12-dmt-032