P3 Gear Assembly; P3 Base Assembly; Loading Base - Hitachi DV-RV8500E/UK Service Manual

Dvd video recorder with video cassette recorder
Hide thumbs Also See for DV-RV8500E/UK:
Table of Contents

Advertisement

Disassembly and Reassembly > Deck Mechanism Disassembly
(30) P2 gear assembly (Fig. A-8-1) and
P3 gear assembly (Fig. A-8-2)
1) Lift the P3 gear assembly.
2) Lift the P2 gear assembly.
Note:
When reinstalling the P2 and P3 gear
assemblies, be sure to align the holes in them.
Hole in P3 Gear Ass'y
BOSS (Tension Lever)
Fig. A-8 P2 Gear Ass'y, P3 Gear Ass'y, P2 Base Ass'y, P3 Base Ass'y, Loading Base
Hole in P2 Gear Ass'y
Gear Glove (A)
Hole (B) in
Slider Plate
Chassis
P3 Base Ass'y
(Fig.A-8-4)
4 - 16
(31) P2 base assembly (Fig. A-8-3) and
P3 base assembly (Fig. A-8-4)
1) Slide the P2 base assembly in the direction
of arrow (A) to release it from the guide hole
in chassis.
2) Slide the P3 base assembly in the direction
of arrow (B) to release it from the guide hole
in chassis.
(32) Loading base (Fig. A-8-5)
1) Release three hooks (H12, H13, H14), and
then lift the loading base.
P3 Gear Ass'y
(Fig.A-8-2)
(H13)
(H12)
(H14)
(B)
P2 Base Ass'y
(Fig.A-8-3)
P2 Gear Ass'y
(Fig.A-8-1)

Loading Base

(Fig.A-8-5)
(A)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv-rv8500e

Table of Contents