Summary of Contents for Alpha-InnoTec Hydraulic tower HT 1
Page 1
Accessories for Air / Water Heat Pumps Outdoor Installation Operating Manual Hydraulic tower HT 1 Hydraulic tower HT 2 83054000dUK – Translation into English of the original German operating manual...
Please read first Symbols This operating manual provides important information The following symbols are used in the operating manual. on the handling of the unit. It is an integral part of the They have the following meaning: product and must be stored so that it is accessible in the immediate vicinity of the unit.
Contents INFORMATION FOR USERS AND QUALIFIED INSTRUCTIONS FOR QUALIFIED TECHNICIANS TECHNICIANS SCOPE OF DELIVERY ..............6 PLEASE READ FIRST ..............2 INSTALLATION AND ASSEMBLY ...........7 SYMBOLS ..................2 Installation location ..............7 Transport to installation location ........7 INTENDED USE ................4 Installation ................7 EXCLUSION OF LIABILITY ............4 Components of the unit ............8 Installation / Hydraulic connection to heating circuit ..9 SAFETY ..................4...
Intended use Safety The hydraulic tower is an accessory for air/water heat The unit is operationally safe when used for the intend- pumps intended for outdoor installation. Taking into ac- ed purpose. The construction and design of the unit con- count the limits of application, the unit can be used in form to the state of the art, all relevant DIN/VDE regu- combination with an outdoor installation air/water heat...
Customer service Operation For technical assistance, please contact your qualified Your decision to purchase a heat pump or a heat pump technician or the manufacturer’s local service partner. system is a long-term contribution to protecting the en- vironment through low emissions and reduced primary energy use.
Maintenance of the unit Scope of delivery The components of the heating circuit and the heat Example of scope of delivery: source (valves, expansion vessels, circulating pumps) should be inspected annually by a qualified technician (heating or cooling system technician). The hot water tank should be cleaned once each year by qualified personnel (heating or cooling system techni- cians).
Installation and assembly If it is not possible to transport the unit to the final in- stallation location using a lifting truck, you can also transport the unit using a hand truck. Observe the following when performing all work: ATTENTION NOTICE.
COMPONENTS OF THE UNIT • Tip the unit slowly and carefully to one side… Secure unit in raised position so that it cannot acci- dentally tip back into the original position. CAUTION! Hands and fingers could be crushed during the following tasks! •...
INSTALLATION / HYDRAULIC CONNECTION TO HEATING Remove front panel of unit. To do this, loosen CIRCUIT quick-release screws on the front panel. Turn coun- ter-clockwise 90°… The connections for the heating circuit, for the cold and hot water and for the circulation are located on the back of the unit.
Electrical connections SAFETY COMPONENT The safety component for the heating circuit is in the ex- Observe the following when performing all work: tra box. Mount the safety component on the connection provid- DANGER! ed on the top of the unit. Danger of fatal injury due to electric The safety drain of the safety valve must lead into the current!
NOTICE. If electric heating elements are installed, you are responsible for the fuse protection of these. After completion of all electrical installation work, close the switch cabinet inside the unit… Close the unit if no further installation work inside the unit is to be performed immediately. Rinsing, filling and bleeding the system Schutzvermerk nach DIN 34 beachten...
Page 12
In order to be supported securely, the U-bolt must bear Connect hose for water inlet to filling and empty- with both ends against the lug: ing tap (provided by customer) between heat pump and hydraulic tower (heating water outlet to heat pump)…...
BLEEDING THE CIRCULATING PUMP OF THE HEATING CIRCUIT Loosen the screw-on cap in the middle of the circulating pump for the heating circuit. 3-way valve 1 button 2 adjusting lever Insulating the hydraulic Rinse hot water circuit for ca. 1 minute… Press button on motor of 3-way valve and simulta- connections neously turn adjusting lever 90°…...
Set the overflow valve Installation of the control element REMARQUE The activities in this section are only necessary Situated at different heights in the front facade of the for in-line tank integration. unit are recesses (each with 4 recesses) for fastening the Complete the worksteps quickly, otherwise the control element: maximum return temperature can be exceeded...
Page 15
Hang the control element’s hooks on the recesses NOTICE. of the front facade (either in the upper or lower A connection to a computer or a network can recesses)… be installed via the left bushing on the bottom of the control element, thus allowing the heat- ing and heat pump regulator to be controlled remotely.
Installation and removal of the Beginning first on one side and moving upwards, lock the screen’s snap-in lugs in place in the slots screen provided on the front of the facade… INSTALLING THE SCREEN NOTICE. The screen is provided at the time of delivery so that the control element may be inserted in the upper recesses of the front facade.
Commissioning Dismantling Follow the instructions in the section entitled DANGER! “Commissioning” in the operating manual for Danger of fatal injury due to electric your heat pump. current! Electrical connections may be installed Make sure of the following… only by qualified electricians. •...
HT 1, HT 2 Dimensional drawings Legend: UK819285- All dimensions in mm. Front view Side view from left Rear view HT 1 HT 2 Control element Safety component (in extra box) Rp ¾" Rp ¾" Ducts for electric/sensor cables hot water R 1"...
Installation plan HT 1, HT 2 Legend: UK819290 All dimensions in mm. Minimum room height 2100 Top edge of finished floor 20 Distance to next object Shaded area = free space for service purposes Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
Hydraulic integration with LW 71A – LW 180A Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
HT 1 / HT 2 with LW 71A – 180A Terminal diagram 3~PE/400V/50Hz 3~N/PE/400V/50Hz 3~N/PE/400V/50Hz 1~N/PE/230V/50Hz B10 A ZW2/SST Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
Circuit diagram HT 1 yellow white Green Brown Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
Page 28
HT 2 Circuit diagram yellow white Green Brown Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
Page 29
Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
Page 30
Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
Page 31
Subject to change without notice | 83054000dUK – Translation into English of the original German operating manual | ait-deutschland GmbH...
Page 32
GmbH Industriestraße 3 D-95359 Kasendorf E info@alpha-innotec.de W www.alpha-innotec.de alpha innotec – an ait-deutschland GmbH brand...
Need help?
Do you have a question about the Hydraulic tower HT 1 and is the answer not in the manual?
Questions and answers