Preliminary Operations - Lennox MiniAir 10 Installation, Operating And Maintenance Manual

Compact air handling unit
Table of Contents

Advertisement

Spare parts must correspond to the requirements specified by Manufacturer.
In case of dismantling of the unit, respect the anti-pollution regulations in force.
N.B. The installer and the user of the apparatus must take into account, and solve problems, connected with any other
type of risk that may occur to the unit. For example, risks derived from the entrance of foreign bodies, or risks due to the
presence of flammable or toxic gas.

4.3 Preliminary Operations

Check the perfect condition of the various components of the unit.
Control that contained within the packing, there are the installation accessories, and documentation.
Transport the packed section as close as is possible to the intended place of installation.
Do not place tools or weight on top of the packed unit.
4.4 Choosing installation position
Position the unit on a solid structure, that will not vibrate, and is capable supporting the weight of the machine.
Position the unit in a point where the condensation discharge may occur easily.
Do not position the unit in an area in which flammable gases, acidic or corrosive substances are present. They
may damage various components in an irreparable manner.
Allow a minimum amount of free space as indicated in the figure. This permits ease of installation and
maintenance.
4.5 Connecting accessories
1.
Fix the angular fixing clamp
2.
Place together the fixing modules
3.
Pass the M8 x 25 screws through the adjacent holes and necessary washers (see diagram)
4.
Screw the nut by hand
5.
Tighten with an Allen key
8
IOM / MINIAIR-0507

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents