Hach SL1000 Basic User Manual page 13

Hide thumbs Also See for Hach SL1000:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Figure 8 Probe connections
Complete probe measurements
Do the procedure that follows to complete a measurement with probe(s). Refer to
Chemkey measurements can be completed at the same time. Refer to
measurements
on page 11.
1. The probe must have the correct service-life time stamp. Set the date and time in the meter
before the probe is attached. Refer to
2. If complete traceability is necessary, enter a site ID and operator ID before measurement. Refer
to
Use an operator ID
3. Remove the probe connector port caps and attach the probe(s). Refer to
the probe connection.
Note: Do not discard the probe connector port caps. Install the probe connector port caps again when no probe
is connected.
4. Rinse the sample flasks with sample.
5. Fill the sample flask with sample so that the sensor is fully in the sample.
6. Put the probe(s) into the probe sample flasks and push Read if the measurement mode is set to
Press to Read. Refer to the probe documentation for more information.
7. The measurement values are shown on the display.
Change the date and time
on page 10 and
Use a site ID
Complete Chemkey
on page 10.
on page 10.
Figure 8
Figure
9. Multiple
on page 13 for
English 13

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents