Setscrews (A)
Setscrew (B)
Needle bar rest
Replacing the Needle Bar Rest
Connector
Needle bar main shaft
Setscrew (C)
Bottom of the head frame
To remove:
1. Remove the spool stand, static head cover
(right), right cover and left cover.
2. Disconnect the thread catcher unit connector.
Remove the 3 setscrews (A). Remove the
thread catcher unit.
Remove the moving head (see pages 22, 23).
3. Loosen the setscrew (B). Pull the needle bar
main shaft up and remove it from the machine.
4. Loosen the setscrew (C) and remove the
needle bar rest from the needle bar main shaft.
To attach:
5. Reverse the procedure above. Attach the
needle bar main shaft so its bottom end is level
with the bottom surface of the head frame.
6. Adjust the needle height after the replacement.
13
elna 9900