STIEBEL ELTRON DHC 6 EC Operation And Installation Instructions Manual page 9

Table of Contents

Advertisement

Available languages

Available languages

1. Installation Instruction
Connecting Water Pipes (concealed
connection)
Connecting the water heater to a wall-
embedded water pipe:
- Connect the nipple joints (Fig 16/B)
to the cold water inlet pipe and the hot
water outlet pipe embedded in the
wall at an
appropriate position and depth (please
pay attention to the distances shown in
the diagram).
- Screw the joints on the unit (Fig 16/A)
to the joints (both hot and cold water),
using a rubber leakage gasket (Fig 16/C)
between the joints.
STIEBEL ELTRON
C
WW
KW
B
min. 46
max. 50
mm
A
Fig 16
for the qualified installer
Installing Water Heater wall-mounted
Connecting the water heater to a wall-
mounted water pipe:
- Connect the prepared water pipe to the
pre-assembled nipple joint.
- Screw the joints on the unit (Fig 17/A)
to the pipe (both hot and cold water),
using a rubber leakage gasket (Fig 17/B)
between the joints.
The company does not
accept liability for any failure
caused by improper installation and /
or unauthorized installers.
The cold water pipe must be turned on
in order to rinse it before installation.
Pressure-resistant equipment must
be used in compliance with accepted
standards.
B
A
KW
Fig 17
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dhc 6 elDhc 8 elDhc 8 ecDhc 10 el

Table of Contents