Kongsberg ACS500 Instruction Manual page 73

Acoustic control system, gisma testport system
Table of Contents

Advertisement

Procedure
Establish contact with SCU 1, using the dunking transducer and the ACU by
1
selecting the
SCU 1
2
Test all functions. Start with
Tap
.
DISARM
Press
, tap and hold
3
Execute
command is executed.
4
When the green LED for the valve operation lights up on the simulator (this might
take some minutes), wait for a second or two, then toggle the valve switch.
The switch simulates that the hydraulic pilot pressure has opened the slide valve.
This should result in a correctly confirmed valve operation.
5
When the LED is switched off, check that the correct status message is displayed on
the ACU screen.
Continue with the
6
Tap
and repeat steps 3 to 5.
ARM
7
Execute all other stack functions from the ACU by tapping the correct function and
repeating steps 3 to 5 for all functions.
Establish contact with SCU 2, using the dunking transducer and the ACU by
8
selecting the
SCU 2
9
Repeat steps 2 to 7 for all stack functions.
10 Some systems also have a possibility to read analogue sensors. These can also be
tested with the simulator.
The toggle switch will simulate low current, 6 mA or high current, 18 mA readings
on the analogue sensor. One of the valve functions has to be operated in order to
simulate these values.
397128/C
tab.
DISARM
on the touch screen at the same time until the
Execute
is displayed if something is wrong.
FAILURE
function (if available).
ARM
tab.
(if available).
Simulation and test
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents