Kongsberg ACS500 Instruction Manual page 146

Acoustic control system, gisma testport system
Table of Contents

Advertisement

Kongsberg ACS500
change the subsea
transducer, 86
charge the ACU, 75
check the dunking
transducer, 77
clean the ACU, 75
clean the dunking
transducer, 77
clean the Subsea Control
Unit, 78, 84
clean the subsea
transducer, 86
duplicate SCU
configuration, 79
install the SCU, 20
install transducer, 21
open the quad battery, 84
open the SCU, 78
Start normal operation,
32–33, 43
test the SCU, 82
use the interseal test kit, 89
humidity
specifications, 124
I
Inspection
equipment, 103
Installation
drawings, 110
planning, 18
SCU, 20
Subsea Control Unit, 20
subsea transducer, 21
transducer, 21
Installation drawings
approval, 19
interconnection cables, 23
Interseal test
SCU, 82
Interseal test kit
assemble, 88
test, 89
Interseal test maintenance, 90
introduction
ACS500, 10
K
Kongsberg ACS500
familiarization, 10
introduction, 10
L
Lifting
equipment, 103
144
Line replaceable units, 92
Acoustic Command
Unit, 93–94
dunking transducers, 93, 95
Subsea Control Unit, 93, 96
subsea transducers, 93, 100
Test equipment, 93, 100
list
cables, 26
List
spare parts, 92
LRUs
Acoustic Command
Unit, 93–94
dunking transducers, 93, 95
SCU, 93, 96
subsea transducers, 93, 100
Test equipment, 93, 100
M
main units, 14
Maintenance, 74
procedures, 74
Maritime authority
approval, 19
Mechanical
drawings, 110
Menu bar, 39
More status, 41
N
Normal operation, 33, 43
Valves, 33, 43
O
Online help, 42
Open quad battery, 84
Open SCU, 78
Opening the cable drum, 30
Operating system
ACU, 14
Operation log, 39
outline dimensions
simulator, 118
Outline dimensions
Acoustic Command
Unit, 112
drawings, 110
dunking transducer, 111
Quad battery unit, 117
Subsea Control Unit, 113
Subsea transducer
TDR30V 34T, 116
Overview
O-rings for test ports, 119
P
Planning
installation, 18
Power level
ACU, 46
SCU, 47
procedure
cabling, 27
Procedure
assemble the interseal
test kit, 88
change subsea
transducer, 86
change the ACU battery, 76
change the battery on
the pressure indicator, 90
change the external quad
battery, 85
change the SCU battery, 81
charge ACU, 75
check the dunking
transducer, 77
clean ACU, 75
clean dunking
transducer, 77
clean SCU, 78, 84
clean subsea transducer, 86
duplicate SCU
configuration, 79
install the SCU, 20
install transducer, 21
open the external quad
battery unit, 84
open the SCU, 78
Starting normal
operation, 32–33, 43
testing the SCU, 82
using the interseal test
kit, 89
Procedures
maintenance, 74
user settings, 46
Product recycling, 103
Purpose
SCU, 15
Simulator, 15
this manual, 9
Transducer, 14–15
Q
Quad battery maintenance, 85
R
Re-packaging
equipment, 104
Read sensor input, 49
397128/C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents