Kongsberg ACS500 Instruction Manual
Kongsberg ACS500 Instruction Manual

Kongsberg ACS500 Instruction Manual

Acoustic control system, gisma testport system
Hide thumbs Also See for ACS500:
Table of Contents

Advertisement

INSTRUCTION MANUAL
ACS500
Acoustic Control System, Gisma testport system

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACS500 and is the answer not in the manual?

Questions and answers

Summary of Contents for Kongsberg ACS500

  • Page 1 INSTRUCTION MANUAL ACS500 Acoustic Control System, Gisma testport system...
  • Page 3 Kongsberg ACS500 Acoustic Control System Instruction Manual, Gisma test port system 397128/C July 2016 © Kongsberg Maritime AS...
  • Page 4 Kongsberg Maritime AS. The document, or any part of it, may not be translated to any other language without the written approval from Kongsberg Maritime AS.
  • Page 5: Table Of Contents

    General supply conditions ..................16 Receipt, unpacking and storage..............16 Equipment responsibility................16 Support information ....................17 PLANNING THE ACS500 INSTALLATION......18 Installation drawings ....................19 INSTALLING THE SUBSEA CONTROL UNIT ...... 20 Installing the Subsea Control Unit .................20 INSTALLING THE SUBSEA TRANSDUCER ......21 Installing the subsea transducer................21...
  • Page 6 Kongsberg ACS500 Powering on the ACS500 ................31 Powering off the ACS500................32 Starting up the surface system..............32 Valve operation................... 33 ACOUSTIC COMMAND UNIT..........34 ACU Computer buttons..................37 Changing the brightness and computer exit........... 37 Power button and battery level..............37 Trackball....................
  • Page 7 Connecting the test equipment ................70 Alternative 1....................70 Alternative 2 (preferred method)..............70 Test procedure ......................70 Testing ACS500 with HiPAP .................72 MAINTENANCE..............74 Acoustic Command Unit ..................75 Cleaning the Acoustic Command Unit............75 Charging the Acoustic Command Unit ............75 Changing the battery on the Acoustic Command Unit ........
  • Page 8 Kongsberg ACS500 Cleaning the subsea transducer ..............86 Replacing the subsea transducer..............86 Interseal test......................88 Assemble the test kit ................... 88 Testing the seal ................... 89 Changing the battery in the Digital pressure indicator........90 ILLUSTRATED SPARE PARTS CATALOGUE ....... 92 Line replaceable units.....................93...
  • Page 9 Instruction Manual, Gisma test port system Disposal ........................103 Inspection ......................103 Lifting ........................103 Re-packaging......................104 Storage after unpacking..................104 Storage after use ....................105 Cleaning cabinets..................105 Mechanical units..................105 Cables...................... 106 Dehumidifier .................... 106 Coatings....................106 Storage prior to installation or use ...............106 Unpacking ......................107 General unpacking procedure ..............
  • Page 10 Kongsberg ACS500 Battery weight and lithium content............. 126 Battery cell manufacturers/types ..............127 Battery design................... 127 Hazards identification...................127 Danger of explosions ................128 Noxious gases................... 128 First-aid measures....................128 Fire-fighting measures ..................129 Handling and storage....................129 Recovering a functioning transponder ............129 Recovering a failing transponder..............
  • Page 11: About This Manual

    Purpose The purpose of this instruction manual is to provide the descriptions and procedures required to allow for safe and efficient installation and use of the Kongsberg ACS500. Target audience This manual is intended for all users of Kongsberg ACS500.
  • Page 12: Acs500

    Kongsberg ACS500 ACS500 Study this chapter to familiarize yourself with the Kongsberg ACS500. Topics • System description on page 11 • System diagram on page 12 • System units on page 14 • List of parts on page 16 • General supply conditions on page 16 •...
  • Page 13: System Description

    ACS500 System description ACS500 is designed for optimal control of subsea valves and is rated to 4000 metre depth. ACS500 may be used to control an blow out preventer system as an emergency system or other subsea valve control functions.
  • Page 14: System Diagram

    Kongsberg ACS500 System diagram A standard ACS500 system diagram is provided. System with y-split cable 397128/C...
  • Page 15 ACS500 System with interface cables 397128/C...
  • Page 16: System Units

    Kongsberg ACS500 System units The Kongsberg ACS500 comprises the following main units. Topics • Acoustic Command Unit on page 14 • Dunking transducer unit on page 14 • Subsea Control Unit on page 15 • Subsea transducer on page 15 •...
  • Page 17: Subsea Transducer

    ACS500 Subsea transducer The transducer will convert electric energy into pressure waves in the water. The characteristics of these pressure waves - power, frequency and shape - are determined by the electric signal applied to the transducer. Subsea Control Unit The SCU is the unit controlling the subsea valves.
  • Page 18: List Of Parts

    Important See Scope of delivery in the registration form for the units in your system. General supply conditions The following general supply conditions apply to this Kongsberg ACS500 delivery. Topics • Equipment responsibility on page 16 • Receipt, unpacking and storage on page 16...
  • Page 19: Support Information

    Unless other arrangements have been made in the contract, the Kongsberg ACS500 guarantee period (as specified in the contract) begins when the acceptance documents have been signed. Support information If you need technical support on the ACS500 you must contact Kongsberg Maritime. • : Strandpromenaden 50, 3190 Horten, Norway Address •...
  • Page 20: Planning The Acs500 Installation

    Kongsberg ACS500 Planning the ACS500 installation This chapter provides the information necessary to plan the installation of the Kongsberg ACS500 according to Kongsberg Maritime’s requirements. Correct installation is vital to the system performance. See your registration form for all parts of your system including cables.
  • Page 21: Installation Drawings

    Kongsberg Maritime offers free advice for installation planning. Proposed arrangements may be sent for commentary or suggestions supplied by Kongsberg Maritime. The following drawings should be submitted should assistance be requested: •...
  • Page 22: Installing The Subsea Control Unit

    Kongsberg ACS500 Installing the Subsea Control Unit This chapter explains how to install the SCU. Note The installation shipyard must provide all necessary installation drawings, and if required, these must be approved by the applicable authorities. Installing the Subsea Control Unit Purpose This procedure explains how to install the SCU.
  • Page 23: Installing The Subsea Transducer

    Installing the subsea transducer Installing the subsea transducer This chapter explains how to install the ACS500 transducer. Note The installation shipyard must provide all necessary installation drawings, and if required, these must be approved by the applicable authorities. Installing the subsea transducer Purpose This procedure explains how to install the subsea transducer.
  • Page 24 Kongsberg ACS500 Tighten the bolts to the torque recommended by the bolt manufacturer. If A4 or similar bolts are used, tighten the bolts to a torque of 40 Nm. 397128/C...
  • Page 25: Cable Layout And Interconnections

    Cable layout and interconnections Cable layout and interconnections This chapter provides the cable plan and cable installation requirements for the Kongsberg ACS500. Topics • Cable plan on page 24 • List of cables on page 26 • Cable procedures on page 27...
  • Page 26: Cable Plan

    Kongsberg ACS500 Cable plan Observe the cable plan for Kongsberg ACS500. All cables are provided from Kongsberg Maritime. System with y-split cable 397128/C...
  • Page 27 Cable layout and interconnections System with interface cables Dunking transducer with cable drum Acoustic Command Unit Subsea Control Unit Subsea Transducer Customer valve package Quad battery pack Field simulator 397128/C...
  • Page 28: List Of Cables

    Kongsberg ACS500 List of cables Observe the list of cables for the Kongsberg ACS500. The numbers refer to the cable plan. References are made to the individual cable drawings specifying each cable with its connectors. See scope of delivery in the registration form for the specific cables in your system.
  • Page 29: Cable Procedures

    Cable layout and interconnections Cable procedures Observe the following procedures to do the ACS500 cabling. All cables are provided by Kongsberg Maritime. In order to ease access for maintenance purposes, and to allow for vibration, make sure that some slack is provided for each cable.
  • Page 30: Connecting The Cable From The Subsea Control Unit To The External Quad Battery Unit (Option)

    Mount any protective covers necessary to prevent the cables being damaged. Connect the cable to the SCU as indicated. Connect the other end to the external battery unit. These are cables ACS500/C4 and ACS500/C5. Connecting the transducer cable from the Subsea Control Unit to the subsea transducer...
  • Page 31: Connecting The Y-Split Cable From The Subsea Control Unit To The Valve Package

    Mount any protective covers necessary to prevent the cables being damaged. Connect the cable to the SCU as indicated. Connect the other end to the valve package. These are cables ACS500/C11 and ACS500/C12. 397128/C...
  • Page 32: Getting Started

    Kongsberg ACS500 Getting started This chapter describes how to get started with the basic operation of the ACS500 system. Topics • Dunking transducer with cable drum on page 30 • Starting operation on page 31 Dunking transducer with cable drum...
  • Page 33: Closing The Cable Drum

    Press the two bars together and press the locking clip into position. Starting operation Once you have powered up the complete ACS500 system, you are ready to start the actual operation. Topics • Powering on the ACS500 on page 31 •...
  • Page 34: Powering Off The Acs500

    Kongsberg ACS500 Powering off the ACS500 Procedure The SCU is powered off by opening the top end cap and removing the battery. See Opening the Subsea Control Unit on page 78. Press the button to the OFF position, to turn off the ACU.
  • Page 35: Valve Operation

    Getting started Valve operation Purpose This procedure shows how to start up the subsea system. The system is delivered with the batteries separate as a safety precaution. Procedure Select the tab with the SCU you want to use. Test if there is communication between the surface and the subsea system. In the section, tap Battery Status...
  • Page 36: Acoustic Command Unit

    Kongsberg ACS500 Acoustic Command Unit This chapter contains detailed descriptions of the ACS500 control panel. 397128/C...
  • Page 37 Acoustic Command Unit Serial line connector for service personnel only Dunking transducer connector USB and LAN connectors for service personnel only switch Power Emergency control (option) button for two hand operation Execute • Use with the ACU control menu to do valve operations. •...
  • Page 38 Kongsberg ACS500 • ACU Computer buttons on page 37 • User interface on page 38 397128/C...
  • Page 39: Acu Computer Buttons

    Acoustic Command Unit ACU Computer buttons Use these buttons and indicators with the ACU. • Changing the brightness and computer exit on page 37 • Power button and battery level on page 37 • Trackball on page 37 Changing the brightness and computer exit Use the + and –...
  • Page 40: User Interface

    Kongsberg ACS500 User interface ACU control is the software installed on the ACU which operates the ACS500 system. • Menu bar on page 39 • System Status on page 40 • Battery status on page 40 • Sensor Input on page 41 •...
  • Page 41: Menu Bar

    Acoustic Command Unit SCU Solenoid Information Exit This turns the computer off, use the button to shut down the complete system. Power Menu bar • SCU 1 and SCU 2 are the operational menus for the two Subsea Command Units and are explained in detail in Operational procedures on page 43.
  • Page 42: System Status

    Kongsberg ACS500 • System Configuration is where you can configure the different options in your system. System Status to see the system status. It is important to know the status of the system before Read executing any commands. Battery status to see the battery status of the Subsea Command Unit.
  • Page 43: Sensor Input

    Acoustic Command Unit Sensor Input to get new readings from the sensors. The time of the reading comes up and Read the colour of the field indicates if the values are within the set parameters. Alarm conditions are shown in red and a dialogue comes up with the alarm details. More Status to get options for Readback status, Read last solenoid currents and time.
  • Page 44: Help

    Kongsberg ACS500 Help to open the online help function. Help button is available on every page and displays relevant information about the Help current operation. Subsea Telemetry Power Tap the arrows to select the Subsea Command Units power setting. Choose between Minimum, Low, High and Maximum.
  • Page 45: Operational Procedures

    • User settings on page 46 • System status on page 48 • Emergency sequence on page 50 • Operating ACS500 from HiPAP (optional) on page 50 • Auto Shutdown (option) on page 51 • Messages on page 54 Valve operation Purpose This procedure shows how to start up the subsea system.
  • Page 46 Kongsberg ACS500 Observe the colour and text of the valve symbol to see if the operation was successful. • Green – The valve operation is done. • Dark green – The valve operation is done, and the system has sent a warning, the warning is displayed by the valve symbol.
  • Page 47: Battery Level

    Operational procedures Battery level This section explains how to find the battery levels on the system. • Battery status, Acoustic Command Unit on page 45 • Battery status, Subsea Control Unit on page 45 • External battery capacity on page 45 Battery status, Acoustic Command Unit Purpose This procedure helps you find the battery level of the ACU.
  • Page 48: User Settings

    Kongsberg ACS500 Purpose This procedure helps you find the battery level of the external batteries. Procedure If the SCU is connected to external batteries, the percentages where the battery indicator changes colour should be divided by the total number of batteries.
  • Page 49: Setting The Telemetry Power Level For The Subsea Control Unit

    Operational procedures to confirm the setting. Setting the telemetry power level for the Subsea Control Unit Purpose This procedure explains how to change the power level for the SCU. Procedure In some cases lower power level may be a better option due to the current available acoustic conditions.
  • Page 50: System Status

    Kongsberg ACS500 System status The following section shows how to find different aspects of the system status. • Checking communication between the Acoustic Command Unit and the Subsea Control Unit on page 48 • Reading the system status information on page 48 •...
  • Page 51: Reading The Sensor Input

    Operational procedures Wait for reply from the SCU. Reading the sensor input Purpose This procedure explains how to read the sensor input. Procedure Select the tab for the SCU you want to see. In the section, tap Sensor Input Read Wait for reply from the SCU.
  • Page 52: Emergency Sequence

    If the buttons are released within five seconds, the sequence is not started. When the LEDs are green, the predefined sequence is executed. Operating ACS500 from HiPAP (optional) Purpose This procedure explains how to operate ACS500 from HiPAP. 397128/C...
  • Page 53: Auto Shutdown (Option)

    APOS Select in the top menu. Control Select ACS500 The ACS500 interface is the same as on the ACU. Notice that on the computer the two hand operation method is to click Execute pressing Click to close the session. Finished Auto Shutdown (option) The Auto Shut Down system is a predefined automated shutdown sequence.
  • Page 54: Valves Used In The Sequence

    Ordinary defined single valve operations may be put together to a predefined sequence of valve operation in order to perform a controlled shutdown of a system. This specific sequence must be defined by the customer and predefined in the ACS500 system parameter set.
  • Page 55 Operational procedures The main window in the ACU will display information about the Auto Shutdown status. The status window will either show Auto Shutdown as Enabled or Disabled. 397128/C...
  • Page 56: Messages

    Kongsberg ACS500 Messages This section gives some tips when something unexpected happens. • No response from SCU on page 54 • Link status on page 54 • System status on page 55 • Link status on page 54 • BOP status on page 56 •...
  • Page 57: System Status

    Operational procedures System status – Read System Status, see Reading the system status information on page 48. Unknown – Normal operation. Telemetry failed, last telemetry command was not confirmed OK from the SCU – Check the connection to the transducer and repeat the telemetry function. See Checking communication between the Acoustic Command Unit and the Subsea Control Unit on page 48.
  • Page 58: Bop Status

    Kongsberg ACS500 – A Valve sequence is already performing. Wait for status Sequence already executing from SCU. , Optional function. This should not be displayed when function is Automatic shutdown not available. – Check configuration settings. , error bit from the SCU regarding software watchdog operation. – Wait 1 SW watchdog minute to power down the SCU and perform a Read System Status operation.
  • Page 59: Battery Status

    Operational procedures Battery status Read SCU remaining battery status capacity [%]. – Yellow background for value below 10 and 20%. Red background indicates less than 10 % remaining battery. Time to change the battery! Alternatively try to use the other SCU Unit, check if this battery capacity is more sufficient until next possible event convenient for battery change.
  • Page 60: More Status

    Kongsberg ACS500 More status This group of functions is used to show an overview over valve read back status (active/passive) for all defined digital read backs. It is also possible to check real time clock values and the last executed solenoid current and possible leakage value.
  • Page 61 Operational procedures Message Description Action Failed Valve operation may be Check details including executed correctly. Read current values in More back status received is not Status. Try to repeat as expected. operation if possible. Check sensors and configuration values. High Current Warning, Dark green Check current reading colour, this specific...
  • Page 62 Kongsberg ACS500 Message Description Action Already armed! Force? Warning. If the BOP is Continue ARM operation already Armed, then this by pressing the Execute message is displayed to the buttons for 5 seconds if operator. appropriate. Already disarmed. Force? Warning. If the BOP is...
  • Page 63 Operational procedures Message Description Action Analogue sensor error Detected SCU error Check BOP Interface and bit message regarding Sensor. Analogue Sensor connection. Sequence aborted Message to confirm that SCU has stopped the execution of a Valve sequence operation. Sequence already executing Wait for status reply from Caution the SCU.
  • Page 64: Case 1; The Valve Package Is Not In

    Kongsberg ACS500 Message Description Action Current leakage Try to read leakage value Caution in More Status. Check other Valve functions Fatal Error detected. SCU will not execute and/or the other SCU Unit. the Valve function due Service/exchange of Unit to current leakage in or interface cabling may be the system.
  • Page 65 Operational procedures The time stamp shows when an ACS function has been executed. Valve 1 is the first function that has been executed correctly with an OK readback and current measurement status. Valve 2 is executed OK, but readback sensor does not confirm OK. Valve status after execution, is sensor OK? Valve 3 and Valve 4 is executed OK, but current readback value is not within specified window, showing either a Low or High current warning.
  • Page 66: Case 2; Trying To Activate A Valve Function Twice

    Kongsberg ACS500 Case 2; Trying to activate a valve function twice Valve 4 has a "Cancelled" status, this valve is not confirmed executed OK, and no status was received from the SCU. Valve 5 execution is stopped with a yellow warning "Valve already executed. Force?"...
  • Page 67: Case 3; Getting No Status Reply After Execution Of A Valve

    Operational procedures Case 3; Getting no status reply after execution of a valve In this figure we are waiting for a missing status reply from the SCU, giving a warning: "Timeout-Force?. Note In a critical operational phase we may still try to execute the function (in Cymbal only, regarding timeout window setup values), without receiving any status read back info from the valve/SCU.
  • Page 68: Case 4; Trying To Activate The

    Kongsberg ACS500 Case 4; Trying to activate the function twice This figure illustrates the case were we try to execute when the valve readback sensor indicates that the valve package is already armed. This is only a yellow warning. Press and tap both execute buttons for 5 seconds in order to perform the function.
  • Page 69 Operational procedures In this figure a possible critical error situation has occurred, giving status "VALVE ERROR". The status in the SCU indicates that the valve package is DISARMED at the same time as other valves are active. Any attempt to execute the ARM function in this situation may cause error due to unwanted execution of the active valves in the system.
  • Page 70: Simulation And Test

    Kongsberg ACS500 Simulation and test This chapter describes the test procedures for the ACS500 system. Topics • Connecting the test equipment on page 70 • Test procedure on page 70 • Testing ACS500 with HiPAP on page 72 397128/C...
  • Page 71 Simulation and test 397128/C...
  • Page 72: Connecting The Test Equipment

    Test procedure You use the simulator provided with the ACS500 system to test. Connect the simulator with the system as described in the previous section. The second alternative is preferred as the transducers are made for communication in water.
  • Page 73 Simulation and test Procedure Establish contact with SCU 1, using the dunking transducer and the ACU by selecting the tab. SCU 1 Test all functions. Start with (if available). DISARM DISARM Press , tap and hold on the touch screen at the same time until the Execute Execute command is executed.
  • Page 74: Testing Acs500 With Hipap

    Kongsberg ACS500 Testing ACS500 with HiPAP Testing the system is also possible using HiPAP. 397128/C...
  • Page 75 Simulation and test Purpose This procedure shows how to set up the test system with HiPAP. Procedure Connect the transducer patch cable. Lower the dunking transducer into water. Caution Make sure there are no obstacles between the dunking transducer and the HiPAP transducer.
  • Page 76: Maintenance

    This chapter provides maintenance procedures provided for the Kongsberg ACS500. The procedures include relevant maintenance, software and test procedures for the main units. Note Major repairs and complete overhaul of the Kongsberg ACS500 can only be done by an authorized Kongsberg Maritime service engineer. Topics •...
  • Page 77: Acoustic Command Unit

    Maintenance Acoustic Command Unit Maintenance on the ACU is mostly keeping the unit charged and clean. • Cleaning the Acoustic Command Unit on page 75 • Charging the Acoustic Command Unit on page 75 • Changing the battery on the Acoustic Command Unit on page 76 Cleaning the Acoustic Command Unit Purpose This procedure explains how to clean the ACU.
  • Page 78: Changing The Battery On The Acoustic Command Unit

    Kongsberg ACS500 If the unit is stored, it is important it is charged every month to keep it ready for operation. Changing the battery on the Acoustic Command Unit Purpose This procedure explains how to change the battery on the ACU.
  • Page 79: Dunking Transducer

    Maintenance Dunking transducer Maintenance on the dunking transducer is mostly keeping the unit clean and the drum and bearings oiled. • Cleaning the dunking transducer on page 77 • Checking the dunking transducer on page 77 Cleaning the dunking transducer Purpose This procedure explains how to clean the dunking transducer.
  • Page 80: Subsea Control Unit

    Kongsberg ACS500 Subsea Control Unit Maintenance on the SCU is mostly changing the battery and checking the seals before the unit is deployed in water. SCU maintenance overview Every time the Subsea Control Unit is taken out of the water •...
  • Page 81: Replace A Subsea Control Unit And Duplicate The Configuration

    Maintenance If the top end cap is stuck it might be an indication of increased pressure inside the unit. Open the vent screw for relief. Use two longer M6 screws for extraction. Insert the screws into the extraction holes on the top of the unit and screw until the lid is open. The M6 screws from the SCU may be used, just pull the lid off the last mm.
  • Page 82: Changing The Battery On The Subsea Control Unit

    SCU to the new SCU. Refer to the code in the dialog box. Enter the new code provided by Kongsberg Maritime Customer Support and select Select the SCU you want to duplicate in the dialog box.
  • Page 83 Maintenance Read Lithium batteries safety procedures on page 125 before handling the batteries. Procedure Open the SCU. See Opening the Subsea Control Unit on page 78. Grab the handle and pull out the old battery. Insert the new battery. Inserting the battery at an angle makes it easier. Place the top end cap back on.
  • Page 84: Testing The Seals On The Subsea Control Unit

    Kongsberg ACS500 See Testing the seal on page 89. Testing the seals on the Subsea Control Unit Purpose This procedure explains how to identify the interseal test ports to verify that the SCU is properly sealed and watertight. Related topics •...
  • Page 85: External Quad Battery Unit For The Subsea Control Unit

    Maintenance Procedure The unit has test ports both in the top end cap, the base and on the side. In addition this model has test ports on the connectors, to make sure these also are watertight. All must be tested at least every year. To do the actual testing, see Testing the seal on page 89 External quad battery unit for the Subsea Control Unit.
  • Page 86: Quad Battery Maintenance Overview

    Kongsberg ACS500 Quad battery maintenance overview Maintenance on the quad battery unit is mostly changing the battery and checking the seals before the unit is deployed in water. Every time the battery unit is taken out of the water • Clean the unit.
  • Page 87: Changing The Batteries In The External Quad Battery Unit

    Maintenance Insert longer M6 screws in the 6 holes, to push open the lid. If this is difficult, there might be a pressure difference. Open the vent screw, for relief and continue opening the lid. Remove the top end cap. Always perform an interseal test on the test port , when the lid has been opened.
  • Page 88: Subsea Transducer

    Kongsberg ACS500 Follow the open procedure in reverse order. See Opening the external quad battery unit on page 84. Clean and screw in the vent screw if it has been opened. Perform an interseal test for the top end cap on the test port, See Testing the seal on page 89.
  • Page 89 Maintenance Remove all cable clips and binding securing the transducer cable to the valve package. Disconnect the cable connector from the Subsea Control Unit. Support the transducer to make sure it doesn’t fall when the securing bolts are removed. Remove the bolts securing the transducer to the valve package. Remove the transducer.
  • Page 90: Interseal Test

    Interseal test All seals that have been opened should be tested before the unit is deployed in water. The interseal test kit is an optional kit for ACS500. • Assemble the test kit on page 88 • Testing the seal on page 89 •...
  • Page 91: Testing The Seal

    Maintenance Make sure there is a small O-ring in the flexible pipe and connect the adapter fitting to the test port for the seal being tested. Make sure there is an O-ring in the other end of the flexible pipe and connect a ¼ BSP.
  • Page 92: Changing The Battery In The Digital Pressure Indicator

    Kongsberg ACS500 If the pressure unit is not Bar, see the Digital pressure indicator manual to change it. Close the selector valve , by turning clockwise. Use the scissor-action handles to pump up the pressure to 11 bar. Adjust with the volume adjuster, if necessary.
  • Page 93 Maintenance Connect a new 9–volt battery and assemble everything in the reverse order. 397128/C...
  • Page 94: Illustrated Spare Parts Catalogue

    Kongsberg ACS500 Illustrated spare parts catalogue This chapter provides you with an illustrated listing of the spare parts that may be replaced on the ACS500. Important The line replaceable units are defined. Additional spares are also identified. Topics • Line replaceable units on page 93 •...
  • Page 95: Line Replaceable Units

    Line replaceable units Acoustic Command Unit The following parts have been defined as line replaceable units in the ACU. • Acoustic Command Unit – Complete unit (The unit must be configured by Kongsberg Maritime service personnel) • Battery Dunking transducer The following parts have been defined as line replaceable units for dunking transducers: •...
  • Page 96: Ordering Spare Parts

    • Acoustic Command Unit, battery on page 95 Acoustic Command Unit line replaceable units The following parts have been defined as line replaceable units in the ACU. • Acoustic Command Unit – Complete unit (The unit must be configured by Kongsberg Maritime service personnel) • Battery...
  • Page 97: Acoustic Command Unit, Complete Unit

    Illustrated spare parts catalogue Acoustic Command Unit, complete unit Item information • : ACU 30 Part name • : 320101 Part number Acoustic Command Unit, battery Item information • : ACU 30 battery Part name • : 373780 Part number Dunking transducer spare parts All spare parts for the dunking transducer are listed here.
  • Page 98: Subsea Control Unit Spare Parts

    Kongsberg ACS500 Item information • : Dunking transducer TDD303 Part name • : 301518 Part number Item information • : Dunking transducer TDD180 Part name • : 320822 Part number Subsea Control Unit spare parts All spare parts for the SCU are listed here.
  • Page 99: Subsea Control Unit, Complete Unit

    Illustrated spare parts catalogue Subsea Control Unit, complete unit Item information • : SCU 34 – 24V 37P TC Part name • : See the registration form for part Part number number information. • : SCU 34 – 48V 37P TC Part name •...
  • Page 100: Subsea Control Unit, Maintenance Kit For Top End Cap

    Kongsberg ACS500 Subsea Control Unit, maintenance kit for top end cap Item information The maintenance kit consists of: • Seal screw • Lock cord • EMI shield • 1 x O-ring 112 mm • 3 x O-ring 107 mm • 2 x O-ring 12 mm •...
  • Page 101: Subsea Control Unit, Interface Cable

    Illustrated spare parts catalogue Subsea Control Unit, interface cable Item information • : Interface cable, IC G37T 11 G37T Part name • : 394500 Part number • : Interface cable, IC G37T 8 G37T Part name • : 394501 Part number •...
  • Page 102: Subsea Transducer Spare Parts

    Kongsberg ACS500 Subsea transducer spare parts All spare parts for the subsea transducer are listed here. Subsea transducer line replaceable units The following parts have been defined as line replaceable units for subsea transducers: • Subsea transducer– Complete unit • Subsea transducer – Transducer cable...
  • Page 103: Simulator

    Illustrated spare parts catalogue Simulator Item information • : ACS Simulator, 16 channels Part name • : 388008 Part number Simulator test cable Item information • : Simulator test cable Part name • : Customer specific, see the registration form. Part number Patch cable for testing with HiPAP Item information...
  • Page 104: Equipment Handling

    Kongsberg ACS500 Equipment handling This section provides the basic rules for transportation, storage and handling of units. In this context, a unit may be any large or small part of the system. It can be supplied as part of the initial delivery, or as a spare part.
  • Page 105: Disposal

    Equipment handling Disposal At the end of the product lifetime, all Kongsberg Maritime products must be disposed in an environmental friendly way. Kongsberg Maritime offers a product recycling service and we recommend that this is used. The service is described on http://www.km.kongsberg.com...
  • Page 106: Re-Packaging

    Kongsberg ACS500 Heavy units may be equipped with lifting lugs for transportation by crane within the workshop or installation area. Before you use a crane: • You must check the applicable weight certificate for the crane. • You must check the security of the lifting lugs.
  • Page 107: Storage After Use

    Equipment handling Note Units containing lithium or alkaline batteries must be handled separately and with care. Such units are marked accordingly. Do not attempt to recharge such batteries, open them or dispose of them by incineration. Refer to the applicable product data sheets. Storage after use If a unit is removed from its operating location and placed into storage, it must be properly cleaned and prepared before packing.
  • Page 108: Cables

    Cables Wipe clean all exposed cables, and check for damage. If a cable shows signs of wear or ageing, contact Kongsberg Maritime for advice. Dehumidifier Place a suitably sized bag of desiccant material (silica gel or similar) into the unit to keep the electronic components as dry as possible.
  • Page 109: Unpacking

    Equipment handling • If any units are damaged, prepare an inspection report stating the condition of the unit and actions taken. Describe the damage and collect photographic evidence if possible. Re-preserve the equipment. • If the units are not damaged, check the humidity absorbing material. If required, dry or replace the bags, then re-pack the unit(s) according to the packing instructions.
  • Page 110: Unpacking Electronic And Electromechanical Units

    Kongsberg ACS500 Place the carton on a stable work bench or on the floor with the top of the carton uppermost. In the absence of other instructions, always open the top of the carton first. The contents will normally have been lowered into the carton from above, so this will usually be the easiest route to follow.
  • Page 111: Transportation

    Transportation Unless otherwise stated in the accompanying documentation, electronic, electro-mechanical and mechanical units supplied by Kongsberg Maritime can be transported using all methods approved for delicate equipment; (by road, rail, air or sea). The units are to be transported in accordance with general or specific instructions for the appropriate unit(s), using pallets, transport cases, or carton boxes as appropriate.
  • Page 112: Drawing File

    Kongsberg ACS500 Drawing file This chapter contains relevant drawings related to the installation and maintenance of the Kongsberg ACS500. Note These mechanical drawings are for information and guidance only. They are not in scale. All dimensions are in mm unless otherwise is noted. The original installation drawings are available on PDF and/or AutoCad's DWG format.
  • Page 113: Dunking Transducer Unit, Outline Dimensions

    Drawing file Dunking transducer unit, outline dimensions 397128/C...
  • Page 114: Acoustic Command Unit, Outline Dimensions

    Kongsberg ACS500 Acoustic Command Unit, outline dimensions 397128/C...
  • Page 115: Subsea Control Unit, Outline Dimensions

    Drawing file Subsea Control Unit, outline dimensions 397128/C...
  • Page 116: Subsea Control Unit, Arrangement

    Kongsberg ACS500 Subsea Control Unit, arrangement 397128/C...
  • Page 117: Subsea Control Unit, Bracket

    Drawing file Subsea Control Unit, bracket 397128/C...
  • Page 118: Tdr30V 34Gt Subsea Transducer, Outline Dimensions

    Kongsberg ACS500 TDR30V 34GT Subsea transducer, outline dimensions 397128/C...
  • Page 119: External Quad Battery Unit For Scu, Outline Dimensions

    Drawing file External quad battery unit for SCU, outline dimensions 397128/C...
  • Page 120: Simulator, Outline Dimensions

    Kongsberg ACS500 Simulator, outline dimensions 397128/C...
  • Page 121: O-Ring Information For Test Ports

    Drawing file O-ring information for test ports O-ring tool KM no: 397286 Lubricants: Use Molykote 1 11 or Parker Super-O-Lube for O-rings. O-ring handling: O-ring 4.00 x 1.50 NBR 70 Use O-ring pick tool KM no: 392833 372654 for gentle O-ring handling.
  • Page 122: Technical Specifications

    This chapter provides the technical specifications and requirements related to the Kongsberg ACS500. Note In Kongsberg, we are continuously working to improve the quality and performance of our products. Technical specifications may therefore be changed without prior notice. Topics • Acoustic link on page 121 •...
  • Page 123: Acoustic Link

    Acoustic link This section provides information about the acoustic link for Kongsberg ACS500. The ACS500 communication system consists of a modem implemented on the Universal Transponder Board (UTB) in both the ACU and the SCU. Each UTB board is directly connected to a transducer in order to send acoustic telegrams in water depths up to 4000 m.
  • Page 124: Performance Specifications

    Kongsberg ACS500 – 23.5 kHz to 24.5 kHz Performance specifications This section provides the performance specifications for the Kongsberg ACS500. Acoustic Command Unit • Degree of protection: IP54 Subsea Control Unit • Operating depth: 4000 m • Communication principle: Phase Shift Keying and Frequency Shift Keying •...
  • Page 125: Weights And Outline Dimensions

    Technical specifications Weights and outline dimensions This section provides the technical specifications and requirements related to weight and outline dimensions. For more detailed information about the dimensions, refer to the chapter Drawing file on page 110. Acoustic Command Unit • Width: 488 mm •...
  • Page 126: Environmental Specifications

    Kongsberg ACS500 • Maximum transmission power: 300 W • Battery usage: approximately 10 hours continual use Subsea Control Unit • Operating voltage: 10 to 18 VDC • Number of batteries: 1 • Cells per battery: 48 • Type of cells: Lithium •...
  • Page 127: Lithium Batteries Safety Procedures

    Lithium batteries safety procedures Lithium batteries safety procedures This chapter includes safety information for the Kongsberg equipment with lithium battery, and separate Kongsberg lithium batteries. It also includes emergency procedures. WARNING This chapter must be read before handling equipment with lithium batteries and separate lithium batteries.
  • Page 128: Company Address

    355324 L14.4 (48), cNODE Maxi Exd 347563 L14.4 (24), cNODE Midi Company address If you need technical support on the ACS500 you must contact Kongsberg Maritime. • : Strandpromenaden 50, 3190 Horten, Norway Address • : +47 33 03 24 07 Telephone, 24h •...
  • Page 129: Battery Cell Manufacturers/Types

    Lithium batteries safety procedures Part number Battery type Battery weight (kg) Lithium content (g) 290-089010 L10/21 (6/12) 290-082380 L10/21 (6/48) 290-089592 L10/50 (12/42) 290-222071 L10/50 (27/28) 290-083530 L50/10/24 290-219492 L24 (98) 290-062447 290-080718 325902 L14.4 (48) 319554 L14.4 (48), cNODE Maxi 5.9 355324 L14.4 (48), cNODE Maxi 347563...
  • Page 130: Danger Of Explosions

    Kongsberg ACS500 During operation, the battery is placed inside the transponder. Water ingression into the transponder can cause dangerous situations. Danger of explosions • If the cells that form the battery exceed the critical temperature of 180° C, they may explode.
  • Page 131: Fire-Fighting Measures

    Lithium batteries safety procedures Eye contact: Irrigate thoroughly with water for at least 15 minutes. Ingestion: Wash out mouth thoroughly with water and give plenty of water to drink. Fire-fighting measures Cool down the battery with copious amounts of cold water. Transponder with lithium battery: •...
  • Page 132: Recovering A Failing Transponder

    Look for outer damages that could involve a water leakage. The transponder housing temperature must be checked to verify a possible temperature increase in the lithium battery. If everything is OK refer to Kongsberg Maritime transponder instruction manuals for normal procedures. Recovering a failing transponder •...
  • Page 133: Opening A Transponder With Defect/Possible Defect Battery

    Lithium batteries safety procedures • If this method is impossible, the transponder can be cooled down with copious amount of cold water. • Use a fire hose. • Repeat this until no gases come out the check valve and the temperature is low and stable.
  • Page 134: Handling Transponders And Separate Transponder Batteries In Case Of An External Fire

    Kongsberg ACS500 • Use a fire hose. • Wash out chemical reaction products with water. Handling transponders and separate transponder batteries in case of an external fire • Remove transponders with lithium battery and separate transponder lithium batteries in case of an external fire if possible •...
  • Page 135: Physical And Chemical Properties

    Lithium batteries safety procedures • Use self contained breathing apparatus. Relief valve opens and noxious gasses come out: • Use a full face mask with minimum BE-filter, and protective equipment of rubber or plastic. Opening transponder with defect/possible defect battery: •...
  • Page 136: Disposal Considerations

    Kongsberg ACS500 Disposal considerations • A lithium thionyl chloride battery does not contain any heavy metals, and is therefore not regarded as special waste (contains only biodegradable parts). • A used transponder lithium battery often contains a significant amount of residual energy.
  • Page 137: Other Information

    Lithium batteries safety procedures Other information The battery cell manufacturers’ safety data sheets are available on the following internet addresses: Saft: www.saftbatteries.com Tadiran / Sonnenschein: www.tadiranbatteries.de 397128/C...
  • Page 138: Type Approval Certificate

    Kongsberg ACS500 Appendix A Type approval certificate 397128/C...
  • Page 139 Appendix A Type approval certificate 397128/C...
  • Page 140 Kongsberg ACS500 397128/C...
  • Page 141 Appendix A Type approval certificate 397128/C...
  • Page 142 Kongsberg ACS500 397128/C...
  • Page 143: Information From The Connector Producer

    Appendix B Information from the connector producer Appendix B Information from the connector producer 3 HINWEISE ZUR HANDHABUNG DER STECKER / INSTRUCTIONS FOR MATING OF PLUGS The following information has been provided by GISMA. For additional details related to the underwater connectors, consult http://www.gisma-connectors.de/. 1.
  • Page 144 Kongsberg ACS500 6. Stecker auf die Einbaudose oder Schottdurchführung aufsetzen. Den Stecker bis zum Einrasten der Führungsnase verdrehen. Mit der einen Hand die Überwurfmutter festziehen, gleichzeitig mit der anderen Hand den Stecker nachführen. Put the plug on to the receptacle, bulkhead or pressure hull penetrators. Twist the connector until the Mechanism locks into place.While tightening the coupling nut with the one...
  • Page 145 118 installation drawings, 19 Drawing Audience ACU outline familiarization this manual, 9 dimensions, 112 ACS500, 10 Auto Shut Down, 51 dunking transducer Fault finding outline dimensions, 111 ACU, 54 O-rings for test ports, 119 quad battery unit outline Change to, 47...
  • Page 146 Kongsberg ACS500 change the subsea Line replaceable units, 92 transducer, 86 Acoustic Command Planning charge the ACU, 75 Unit, 93–94 installation, 18 check the dunking dunking transducers, 93, 95 Power level transducer, 77 Subsea Control Unit, 93, 96 ACU, 46...
  • Page 147 113 System Configuration, 39 Electronic Equipment, 103 Power level, 47 System description WEEE, 103 purpose, 15 ACS500, 11 Solenoid Information, 42 System status, 40 SCU battery, 81 ACU, 48 SCU battery level, 45 System Status, 48 SCU maintenance, 78–79,...
  • Page 148 © 2016 Kongsberg Maritime...

Table of Contents