Set-up and Initial Commissioning
8

Initial start-up

.04
O Inspect the machine, particularly the electric cables, for any damage.
O Remove the plug 1 of the oil reservoir 2 before the initial commissioning.
O Clean the machine thoroughly and then oil it, see also chapter 12 Maintenance and
O Connect the machine to the compressed air system. The manometer 3 must show a
O Arrange for technical staff to check whether the machine's motor may be operated at the
O With the machine running, the handwheel must turn towards the operator, otherwise
26
Fig. 8 - 06
The plug 1 serves solely for transit support and may not be used during the
sewing operations.
Care.
pressure of 6 bar. Set this value if required, see chapter 12.04 Checking / setting the air
pressure.
existing mains voltage and whether it is connected properly.
Never operate the machine if there are any differences.
The machine must only be connected to a grounded socket!
arrange for technical staff to adjust the motor, see chapter 11.02 Parameter settings.