1.3
Installation and removal
For safety, turn OFF the inverter when installing or removing the operation panel (FR-LU08).
1.3.1
Installing the operation panel to the inverter
• Installation
(1) Remove the operation panel (FR-DU08) from the inverter. (For the removal of the operation panel, refer to the Instruction
Manual of the inverter.)
(2) Align the connector of the FR-LU08 with the PU connector of the inverter, and insert the operation panel. After confirming
that the operation panel is fit securely, tighten the screws. (Tightening torque: 0.40 to 0.45 N·m)
PRE-OPERATION INSTRUCTIONS
1
Fasten
Fasten
7