Specification Input And Update; Design Quality Evaluation Capability Qualification; Quality And Reliability Deliverables List - Philips BDL4785SL/00 Service Manual

47 inch fhd lcd public display
Hide thumbs Also See for BDL4785SL/00:
Table of Contents

Advertisement

10.2

Specification input and update

The product specification shall be initiated by MMD and supported by concerned engineering department
such as E/M/S, Safety/Approbation Group and DQE before RFQ. It must be updated in each product
creation milestone. DQE engineers will be responsible to make product quality and reliability definition
based on the product characteristics and requirements.
10.3

Design quality evaluation capability qualification

During the product creating process, the DQE has to support to regulate the supplier design quality and
reliability evaluation capability to ensure the supplier is qualified to create the best quality and reliability
product to provide to MMD.
10.4

Quality and reliability deliverables list

During product creation RFQ milestone the DQE has to provide deliverables list to supplier and discuss
with them to perform quality and reliability evaluation and testing report per request in list to DQE for
design quality and reliability review and validation.
Model No. :
1
Front of screen tests
1.1
Brightness/Contrast
1.1.1
Brightness control range
1.1.2
Contrast control range
1.1.3
Luminance uniformity
1.1.4
Luminance transition
1.1.5
Contrast ratio
1.1.6
Luminance-full white
1.1.7
Dimming range
1.1.8
Contrast vs. viewing angles
General Product Specification
Test Item
Date :
MMD Milestone
EVT DVT EVT PVT PVT
v
1
v
v
1
v
v
2
v
v
1
v
v
1
v
v
1
v
v
1
v
1
BDL5585XL LCD
Supplier
Milestone
Philip v.s. Qisda
EVT/DVT v.s.
EVT ; PVT v.s.
PVT
1
1
1
1
1
1
116

Advertisement

Table of Contents
loading

Table of Contents