Figure 22: Installing Cable Conduits; Figure 23: General Wiring Of The Analog Input Terminal Block - GE hydran m2 Installation Manual

Transformer gas monitoring system
Table of Contents

Advertisement

Note: This optional Analog Input
board can be installed at any of
the four I/O locations.
Page 26
1. Mount the required, watertight conduits fittings: ½"-
NPT, PG-13 or M20, with locknuts and sealing gaskets.
2. Mount required flexible conduits.
3. Ground all metallic conduits.
4. Ensure that the plugs of all unused openings are
securely in place.

Figure 22: Installing Cable Conduits

Figure 23: General Wiring of the Analog Input Terminal Block

Hydran* M2 Installation Guide
16375 v9.0 Oct 12