Appendix 2 : Periodic Inspection/ Maintenance List
Date:
Environment inspection
The cooling unit is installed in?
Is it free of dust and surplus moisture?
Is the cabinet appearance perfect without damage?
Record the supply air temperature
Record the chilled water outlet temperature
Record the supply air set point
Can the cooling unit reach the set point?
Internal inspection
Is there any impurity or foreign matter in the condensed water
pan?
Do the fans act normally and rotate without interference?
Does the drain pump act normally?
Be sure to disconnect the input power before making the following inspections.
Are the electronic joints stable and free of foreign matter?
Does the input power match the rated value of the cooling unit?
NOTE:
Please copy this page for use during the inspection/ maintenance procedures.
InfraSuite RowCool Precision Cooling –
Chilled Water
Monthly Inspection/ Maintenance List
Model:
Signature: ______________________________________
56
By:
_____________________
Yes /
No
Yes /
No
________degree (s)
________degree (s)
________degree (s)
Yes /
No
Yes /
No
Yes
/
Replacement
or cleaning is needed
Yes /
No
Yes /
No
Yes /
No
Yes /
No
Yes /
No