4.1

Pre Start-up Inspection

WARNING:
2. The inner high voltage of this unit is potentially fatal! Make sure the input power
3. A startup without correctly completing 4.1 Pre Start-up Inspection may lead to
Please complete all the following inspections before implementing the initial startup
procedures.
Inspection List
General items
___The unit has no external damage.
___All the installation procedures have been performed in accordance with the
instructions in Chapter 3: Installation.
___The pipes in and outside the cabinet have been correctly connected and the thermal
insulating layer of the pipes are free of damage and leakage.
has been connected.
Environment
___The inner environment is an enclosed space and isolated from interference from
outside temperature and humidity.
___The reserved space around the cabinet conforms to the regulation (See 3.2 Space
Reservation).
Electronic connection
___The rated value of the input power conforms to that marked on the nameplate.
___The equipment has been properly grounded.
___All electronic connections are tight and stable.

Chapter 4 : Initial Startup

chapter.
has been disconnected before the following actions.
serious personal injury or equipment damage!
27