Fujitsu AUXB04GALH Service Manual page 189

Airstage v-iii
Hide thumbs Also See for AUXB04GALH:
Table of Contents

Advertisement

SERVICE PARTS INFORMATION 9
Reactor
Check Point 1 : Appearance check
No fissures, breaks, damage, etc. at the body and winding section, terminals section?
Check Point 2 : Electric check
Set the tester to the "Resistance" mode, and check for open/short between both ends of the reactor wire
(or connector).
Judge the result of
as follows:
Short
: Normal
Open
: Abnormal (open)
04-113

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents