CHAPTER 2 Connected Information
(High-efficiency/Standard) 200V Dual Power feed
It is necessary to arrange six PSUs, six power cables (200 V IEC60320 C20) and four power distribution
boxes (200 V IEC60320 C19×3type) for 200 V dual power feed configuration.
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution
panel. See
"2.6 Cutoff Characteristics of Distribution Panel (At the time of connecting power distribution
FIGURE 2.26 PRIMEQUEST 2400E3 with Memory Scale-up Board/2800E3/2800B3/2400E2 with Memory
Scale-up Board/2800E2/2800B2/2800E/2800B (High-efficiency/Standard) 200V Dual Power feed
Number
(1)
(2)

2.3.3 Power Cable Connections (PCI_Box)

This section shows the figure of input power of PCI_Box.
Remarks
While configuring redundant power feed and dual power feed in this device, configure the same power feed
to PCI_Box.
Power distribution box (200V C 19  3 type) AC#0
Power distribution box (200V C 19  3 type) AC#1
47