GE Digital Energy SG 400 kVA Operating Manual page 77

Digital energy sg series 400 & 500 kva
Table of Contents

Advertisement

3. Disconnect the Battery from all Units (only for UPS configuration without external
Battery Breaker Release).
• Wait 5 minutes for DC-Link Capacitors to discharge
Before you proceed with any kind of
intervention on the UPS, make sure the DC-Link
voltage be less than 15 VDC.
First operated unit
4. Disconnect the Utility supply from all Units.
• All LED's are OFF.
First operated unit
Modifications reserved
OPM_SGS_USM_M40_M50_1US_V020.doc
.
END OF PROCEDURE
metering
Ub=15V
Ib= + 0A
Battery Temp=
+ 20 ° C
alarms
Charge Level=
87%
Autonomy
=
12min
parameters
All other units of the system
All other units of the system
Operating Manual SG Series 400 & 500 kVA
+
ok
Page 77/86