GE Digital Energy SG 400 kVA Operating Manual page 74

Digital energy sg series 400 & 500 kva
Table of Contents

Advertisement

3. Disconnect the Battery from the Unit to separate (only for UPS configuration without
external Battery Breaker Release).
Wait 5 minutes for DC-Link Capacitors to discharge.
Before you proceed with any kind of
intervention on the UPS, make sure the DC-Link
voltage be less than 15 VDC.
4. Disconnect the Utility supply from the separated Unit.
First operated unit
NOTE !
For any further intervention could nearest Service Center.
Modifications reserved
OPM_SGS_USM_M40_M50_1US_V020.doc
END OF PROCEDURE
metering
Ub=15V
Ib= + 0A
Battery Temp=
+ 20 ° C
alarms
Charge Level=
87%
Autonomy
=
12min
parameters
All other units of the system
Operating Manual SG Series 400 & 500 kVA
+
ok
Page 74/86

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Digital energy sg 500 kva

Table of Contents