Mercury 5 SERIES Service Manual page 67

4-stroke
Table of Contents

Advertisement

CHARGING SYSTEM
Lighting Coil Removal and Installation
Removal
1. Remove manual starter. Refer to Section 8.
2. Remove flywheel. Refer to Section 2A.
3. Remove screw and clamp.
4. Disconnect both YELLOW/RED coil leads.
5. Remove screws securing lighting coil, then remove coil.
a -
b -
Installation
1. Route lighting coil leads, as shown and place coil over mounting bosses of crankcase
cover.
2. Secure coil with 2 screws. Torque screws to 14 lb-in. (1.6 Nm).
3. Secure coil leads/sleeve, using wire clamp and screw. Tighten screw securely.
4. Connect both YELLOW/RED lighting coil leads to rectifier or lighting harness.
a -
b -
c -
5. Install flywheel. Refer to Section 2A.
6. Install manual starter. Refer to Section 8.
Page 2B-4
d
Screw
Clamp
b
d
a
Lighting Coil Leads
Coil
Screws (2)
c
b
a
56284
c -
Screws (2)
d -
Lighting Coil
c
e
56285
d -
Wire Clamp
e -
Screw
90-857138R1 MAY 2000

Advertisement

Table of Contents
loading

This manual is also suitable for:

6 series4 series

Table of Contents