3. Handling and unpacking

The vacuum unit is shipped in a cardboard box with appropriate reinforcements to protect it against impact
during transport and delivery. We recommend that you do not remove the packaging until installation to
prevent damage.
Never turn the Central still packed.
Do not use cutters for removing of the package
The manufacturer declines all responsibility for any damage caused by incorrectly opening
packaging.
Handling operations use the appropriate personal protective equipment.
Failure to use the appropriate DPI during handling and unpacking exhibits
the operator to the risk of crushing the foot for stability loss.
Failure to use the glove does not guarantee a secure grip in the handling with the risk of an
accidental fall.
1. OVIM
Upon delivery, you must immediately check the compliance and integrity of the material
with the carrier not to give rise to claims for damages not attributable to transport.
If there is any damage to the equipment you need to do the following:
• annotate on the transport document (copy of the carrier), the type of damage;
• send to the carrier by registered letter to the damage claim within two days;
• contact the manufacturer's customer service for any parts to be replaced.
>>> Handing and unpacking