REPLACEMENT OF PARTS
IMPORTANT: AFTER REASSEMBLY
THE COMBUSTION MUST BE
CHECKED USING THE PROCE
DURE IN THE SECTION "SETTING
THE GAS AIR RATIO". MEASURE
MENT AND SETTING (IF NECES
SARY) OF THE GAS RATIO MUST
NOT BE ATTEMPTED UNLESS THE
................ ································1
I······
PERSON IS EQLlIPPED WITH A
I
I
COMBUSTION ANALYSER CON
I
FORMING TO BS 7927 AND IS COM
I
I
PETENT IN ITS USE.
I
I
I
I
I
12.
Fan assembly
I
~
Remove electrical connector from fan.
I
~
Remove condensate trap
I
I
(see page 42).
I
12.1
~
Undo the union connection (A).
I
I
~
Remove wire clip (8) from air/gas
I
adjustment assembly (e) then pull gas
I
pipe down.
I
I
12.2
~
Unscrew two screws (D).
I
12.3
~
Remove fan from boiler.
I
12.4
~
Remove three screws retaining the
I
I
air/gas adjustment assembly (E).
I
~
Reassemble with new fan assuring that
I
I
seals are correctly fitted.
I
'\
13.
Electrode assembly
\
I
\
~
Disconnect spark electrodes and flame
sensor connection.
~
Remove two screws (F).
~
Remove spark/flame electrode assem
bly (G) from heat exchanger.
flI# ; · ·..... ••• .... • .. ·-...
iliili
lll
12
.
4
~
'
...
,
' .
I
..
I
,
I
\
I
\
I
...
\
I
\
I
I
I
E........ } ••••••••
J
\
I
I
I
\
..
I
\
I
•
I
\
I
\,
"
""~"
'
'~,.,
...
- ...
"'
...
"''''.",
"
lNSTALLATION & SERVlCING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 25CDi/3OCDV37CO';'2 COl
AORCESTER
REPLACEMENT OF PARTS
67".ru 613700. (=61'1)
BoIscIt Group