I
I
\
I
I
INSPECTION AND SERVICE
Setting Boiler to Maximum.
NOTE: When running in the heating boost
mode, the boiler will operate both the Central
Heating and DHW circuits. This is to allow suf
ficient time for setting procedure.
It will be necessary to run water through the
DHW circuit to ensure that the boiler will not
cycle
on
low heating demands.
A - On/off button
B - On/off and fault indicator (BLUE)
C - Central heating temperature control
D - Burner indicator (GREEN)
E - Reset button
F - Service button
G - DHW temperature control
H - ECO button
System pressure gauge
Cover or optional programmer
K - Display
L - Central heating boost button
M - Holiday button
II>
Press and HOLD central heating boost
button (L) for 10 seconds and set Central
Heating temperature to maximum.
I
• The central heating boost button will illumi
nate continually.
• The boiler will stay in this mode for 15
minutes unless the central heating boost
button is pressed again.
2
II>
Pull the cover off and connect a manome
ter to the fan pressure test point.
II>
After measurement replace test point
cover.
Pressure will read negative and
be
greater than:
25CDi - 2.8 mbar
30CDi - 3.9 mbar
37CDi - 3.9 moor
42CDi - 4.B mbar
• Pressures measured below these figures
will indicate that the heat exchanger will
require cleaning.
• There is a special accessory kit available
specifically designed for cleaning the heat
exchanger. If required order 7 719 001 996.
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 25CDil3OCDi/37CDV42 COl
tAORCESTER
INSPECTION AND SERVICE
67'20 613 700.
(2006/1 1)