Worcester GREENSTAR 25CDi GC Instruction Manual page 44

Wall hung rsf gas-fired condensing combination boiler
Hide thumbs Also See for GREENSTAR 25CDi GC:
Table of Contents

Advertisement

REPLACEMENT OF PARTS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'"
"
'f
I
I
:
A_~H""l
I
I
I
I
I
7. Gasvalve
I>
Isolate gas supply at boiler gas cock
I>
Push air inlet tube (A) upwards.
7.1
I>
Undo top gas connection (B) to gas valve.
7.1
I>
Undo bottom gas connection (C) to gas
valve.
7.2
I>
Undo two securing screws (D) on the
underside of casing.
I>
Pull valve up and forward out of boiler.
I>
Disconnect electrical connections.
I>
Replace valve with new seals and check
for gas soundness.
Note: The valve wiJJ require setting, follow pro­
cedure ·Setting the gas/air ratio' in the gas
conversion section.
8. Siphon
8.1
I>
Pull condensate pipe out of the adapter.
8.21> Remove trap from boiler.
I>
Clean trap and check that the connection
to the heat exchanger is clear.
I>
Fill the condensate trap with approxi ­
mately 1/4 litre of water and refit in reverse
order.
INSTALLATION & SERVICING INSTRUCTiONS FOR WORCESTER BOSCH
GREEN~rr',i'~,
. ),/3OCO<l37CDi/42
CD,
~ORCESTER
REPLACEMENT OF PARTS
6J.20 613
7003
(2006/11}

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30cdi gcGreenstar 37cdi gcGreenstar 42cdi gc

Table of Contents