Worcester GREENSTAR 25CDi GC Instruction Manual page 14

Wall hung rsf gas-fired condensing combination boiler
Hide thumbs Also See for GREENSTAR 25CDi GC:
Table of Contents

Advertisement

BOILER LOCATION &
CLEARANCES
®
750mm
®
600mm
radius
750mm
2250mm
BATHROOMS:
The boiler can
be
installed in zones 2 or 3. If a
mechanical or RF mechanical timer or text dis­
play with room thermostat (lp
20
only) is fitted
the boiler can only
be
installed in zone
3.
A Non mechanical timer can be installed in
zone
2.
See lEE wiring regulations.
(See Technical Data for IP ratings.)
IMPORTANT: any switch or appliance
control using
230 V
mains electricity must
not be able to be touched by a person
using the bath or shower.
Electrical switches, fused spur and socket
outlets must not be situated in the bath­
room.
For further information about bathroom installa ­
tions please consult Operational Procedures
Part
20.
Electricity.
2250mm
6: 720611927-13.10
INSfALLATION & SERVICING INSfRucnONS FOR WORCESTER BOSCH GREENSfAR 2SCDil3OCD,/37CD,'42 CD,
~ORCES1ER
BOILER LOCATION & CLEARANCES
6720 613 700a (2006111)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30cdi gcGreenstar 37cdi gcGreenstar 42cdi gc

Table of Contents