Worcester GREENSTAR 25CDi GC Instruction Manual page 39

Wall hung rsf gas-fired condensing combination boiler
Hide thumbs Also See for GREENSTAR 25CDi GC:
Table of Contents

Advertisement

I
I
I
I
J
I
\
"
; ;
;
"
INSPECTION AND SERVICE
COMPONENT ACCESS
1. Removing outer case
1. Remove bottom panel by pulling it forward
and off.
1.1 Undo but do not remove ille 2 screws
"",
,,' ,
(A) securing boiler casing at ille bottom of
ille appliance.
"''''''''
........
_
......
- " ,
1.2 Pull upwards to release the clip (B) on top
of the boiler.
1.3 Pull case forward and remove.
I
, .......... -_................... 1.1
'. '.
"
,
\
\
"
\
\
I
\
I
"
I
I
I
I
I
I
"
\
I
,
\
I
\
r;,..
I
"
~
I
"'II"",
",,,,,'
"'''
...............
-'
,----­
,
I
I
2. Adjusting boiler control to
I
I
service position
I
2.1 Remove screw (X) securing control.
I
I
2.2 Gently pull forward until it comes to
I
rest in service position.
,
I
,
I
I
I
I
\
\
, ,
,
'It,,__
"
2.1
"-. -'"
I
~~
1
""' .... ""',---- ...... ---- ------- .... --I
1
I
I
I
I
I
I
I
I
I
I
I
I
II
I
I
Primary Heat Exchanger
I
I
There is a special accessory kit available
I
specifically clesigned for cleaning the heat
exchanger. If required order 7 719001 996.
3. .. Check fan pressure at the test point next
to the fan using an electronic manometer
.. The boiler must be run at maximum output.
Pressure will read negative and be greater
than:
25CDi • 2.8 mbar
30CDi· 3.9 mbar
37CDi ·3.9 moor
42CDi . 4.8 moor
.. Pressures measured below these figures
will indicate that the heat exchanger will
require cleaning.
~WORCESTER
INSTALLATION
&
SERVICING INSTRUCTIONS FOR WORCESTER EIOSCH (lREENSTAR 25CDY3OCDY37CDV42CDi
INSPECTION AND SERVICE
67'2061$ 7OOa(2006111)
Bosch Group

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30cdi gcGreenstar 37cdi gcGreenstar 42cdi gc

Table of Contents