5
Reassembly
The reassembly is done in the following order:
1. Main PBA (a) & RF Cable (b)
2. FPC Link (a) & Tape ZIF Connector (b)
3. Cover Front Assy (a) & Tape Connector (b)
4. Sub Board Assy (a) & Tape Connector (b)
5. Rear Cover Assy
6. Core Unit Label
7. Battery
8. Cover Battery Assy
5.1
RF Cable
Press to connect this end of the RF Cable.
Press to snap the hook as shown.
5.2
FPC Link & Tape ZIF
Connector
Insert a new FPC Link to the ZIF connector of the Main PBA.
1266-5134 Rev 2
Sony Mobile Communications AB – Company Internal
Working Instructions (mech)
50(60)