ABLE INSTALLATION
1) Install all required cables and leads. Make sure that the cables are secured against
slipping off.
2) Connect the MCR 5000 device with a power source by using the "AC in" socket. If
you'd like to supply a monitor or any other component with power as well, you could
do this by connecting the component to the "AC out" socket at the MCR 5000.
3) Verify that all cables and leads are correctly installed.
4) The power supply is enabled by pushing the Power button (1.). Subsequently turn the
device on by using the ATX button (2.).
4.3 R
EADINESS FOR
Accurately check the unit for any hidden damages possibly incurred during improper
transport and/or handling or wrong operation site and/or storage conditions (e.g. smoke
emissions or formation by the unit, etc.). If any damages are found, the unit must be
decommissioned or scrapped. Ensure that it is safe from accidental re-implementation.
4.4 S
TATUS DISPLAYS
SYS LED (
Depending on the colour and type of flashing different device states are displayed by the
SYS LED.
The following signals are displayed:
24
O
C
PERATION
HECKS
)
BICOLOURED
LED lights green
LED is off
Industrial PCs MCR5000
The device is ready for operation. (Power ON)
The device is switched off. (Power OFF)