Checking The Os-10 System Installation - Patton electronics OnSite 07MOS10xx-GS Getting Started Manual

Metro-optical transport access nodes
Table of Contents

Advertisement

OnSite Series Getting Started Guide
9. Connect the negative lead of the circuit to the "B" power input lead on the OS-10 system terminal block.
See wiring 3-B on
figure 13
Note
CAUTION
10. Secure the wires using cable ties or similar appropriate cable tie-downs.
11. Turn on power to the DC circuit.
Note

Checking the OS-10 System Installation

When you first apply power to the system, the STAT (status) LED shows a solid amber light. This light indi-
cates that the system is booting. The STAT LED turns to a solid green light when the system completes the
boot process and is ready for operation.
OnSite System Installation
on page 36.
The terminal block indicates the "B" power lead by the letter B. This
lead is third from the top on the OS-10 system terminal block.
Do not over torque the terminal block captive thumbscrew or ter-
minal block contact screws.
The green PWR (power) LED on the front panel is lit when the sys-
tem receives power from the DC source.
3 • Installation Overview
38

Advertisement

Table of Contents
loading

This manual is also suitable for:

Onsite 1063Onsite 1052 seriesOnsite 1063 series

Table of Contents