Package Checklist; Preparation - Paradyne Hotwire 8300 Installation Instructions Manual

Endpoint
Hide thumbs Also See for Hotwire 8300:
Table of Contents

Advertisement

Package Checklist

Verify that your package contains the following:
8300 Endpoint
Power cord
8-pin modular cable for connection to the DSL network
Ferrite choke for the Ethernet cable
A DB9-to-DB9 cable for connection to an asynchronous terminal or PC (personal
computer) is included with some models.

Preparation

Make sure you have:
A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the 8300 Endpoint
A clean, well-lit, and ventilated site that is free from environmental extremes
One to two feet of clearance for cable connections
An asynchronous terminal or PC
A physical connection to the G.shdsl line
A physical connection to an Ethernet LAN, if used, and an 8-pin modular cable
A physical connection to a router, if used, and an appropriate shielded serial cable
A physical connection to a PBX, if used, and an RJ48C modular cable
For additional information, see the 8300 User's Guide .
Before you install the unit, please refer to the
Be sure to register your warranty at www.paradyne.com/warranty.
Important Safety Instructions
2
on page 12.

Advertisement

Table of Contents
loading

Table of Contents