Emerson Micro Motion 3700 Installation Manual page 21

Hide thumbs Also See for Micro Motion 3700:
Table of Contents

Advertisement

Figure 3-7: Shielded heat shrink covering exposed drain wires
Figure 3-8: Folded cloth
Figure 3-9: Installing the gland body
7. Insert the wires through the gland body and assemble the gland by tightening the
8. Identify the wires in the 4-wire cable.
9. Connect the four wires to the numbered slots on the core processor. See
Installation Manual
g. Position gland clamping insert so the interior end is flush with the heat shrink.
h. Fold the cloth shield or braid and drain wires over the clamping insert and
approximately 1/8 inch (3 mm) past the O-ring. See
i. Install the gland body into the core processor housing conduit opening. See
3-9.
gland nut.
Use the 4-wire cable supplied by Micro Motion. This cable consists of one pair of 18
2
AWG (0,75 mm
) wires (red and black) for the VDC connection, and one pair of 22
2
AWG (0,35 mm
) wire (green and white) for the RS-485 connection.
Wiring
Figure
3-8.
Figure
Figure
3-10.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micro motion 3350

Table of Contents