5 Installation Instruction
1)
Check the installation location and ensure it is strength and level, so that the unit will not
cause any operating vibration or noise after installation.
2)
In accordance with the foundation drawing in the Fig. 6, please drill 4 holes in the installation
location.
A: The outlet side
3)
Fix the unit securely with the foundation bolts. You can get the M10 or M8 foundation bolts,
nuts and washers from the market.
4)
Rubber or spring shock absorbers should be used during the installation of the outdoor
unit to meet the noise and vibration requirements.
5)
Screw the foundation bolts into the ground, and it is better that their length is less than
20mm from the foundation face.
B: Bottom view (mm)
Fig. 6
Fig. 7
10
C: Drain hole