Daikin RY35GXV1 Service Manual page 89

Hide thumbs Also See for RY35GXV1:
Table of Contents

Advertisement

Indoor Unit
Step
3
Widen the auxiliary
piping to the extent of
10°~20°.
Unscrew the fixing
4
screw on the left side.
5
Push and undo the heat
exchanger fixing hook
on the right side and lift
up the heat exchanger.
Pull the
heat exchanger
6
to the front side and
undo the hooks
completely, and then lift
it.
78
Procedure
Heat exchanger fixing hook
Heat exchanger
Points
At an angle of 10°~20°
Caution
When dismounting or
mounting the heat
exchanger, be sure to wear
gloves or wrap it with cloth
before proceeding to the
work. (You may be injured by
the fins.)
(R8619)
(R8620)
(R8043)
Removal Procedure
SiBE01-829

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents