Daikin RY35GXV1 Service Manual page 117

Hide thumbs Also See for RY35GXV1:
Table of Contents

Advertisement

Piping Diagrams
RY25GXV1
OUTDOOR UNIT
7.0CuT
7.0CuT
RY35GXV1
OUTDOOR UNIT
7.0CuT
7.0CuT
106
HEAT EXCHANGER
HEAT EXCHANGER
THERMISTOR
7.0CuT
6.4CuT
MUFFLER
M
WITH
FILTER
PROPELLER FAN
9.5CuT
FOUR WAY
VALVE
ON:HEATING
COMPRESSOR
ACCUMULATOR
HEAT EXCHANGER
HEAT EXCHANGER
THERMISTOR
4.8CuT
6.4CuT
4.8CuT
MUFFLER
M
WITH
FILTER
PROPELLER FAN
9.5CuT
FOUR WAY
VALVE
ON:HEATING
COMPRESSOR
ACCUMULATOR
6.4CuT
CHECK VALVE
6.4CuT
6.4CuT
CAPILLARY
TUBE 1
CAPILLARY
TUBE 2
LIQUID STOP
VALVE
9.5CuT
GAS STOP
VALVE
6.4CuT
6.4CuT
CHECK VALVE
6.4CuT
CAPILLARY
TUBE 1
CAPILLARY
TUBE 2
LIQUID STOP
VALVE
9.5CuT
12.7CuT
GAS STOP
VALVE
SiBE01-829
FIELD PIPING
(6.4CuT)
FIELD PIPING
REFRIGERANT FLOW
(9.5CuT)
COOLING
HEATING
3D060140
FIELD PIPING
(6.4CuT)
FIELD PIPING
REFRIGERANT FLOW
(12.7CuT)
COOLING
HEATING
3D060141
Appendix

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents