Installation Of Monitor; Open The Package And Check; Connect The Power Cables; Power On The Monitor - EDAN M3 Service Manual

Vital signs monitor
Hide thumbs Also See for M3:
Table of Contents

Advertisement

3 Installation of Monitor

3.1 Open the Package and Check

Open the package and take out the monitor and accessories carefully. Keep the package for
possible future transportation or storage. Check the components according to the packing list.
n Check for any mechanical damage.
n Check all the cables, modules and accessories.
If there is any problem, contact the manufacturer or local representative immediately.

3.2 Connect the Power Cables

Connection procedure of the AC power line:
n Make sure the AC power supply complies with following specification: 100~240VAC,
50/60Hz.
n Apply the power line provided with the monitor. Plug the power line to input interface of the
monitor. Connect the other end of the power line to a grounded 3-phase power output.
n Connect to the ground line if necessary. Refer to Chapter Safety Guidance in User manual for
details.
NOTE:
When the battery configuration is provided, after the monitor is transported or stored, the
battery must be charged. Powering on without connecting AC power supply may cause
the monitor out of work. Switch on AC power supply can charge the battery no matter if
the monitor is powered on.

3.3 Power on the Monitor

Power on, LOGO information will be displayed on the screen.
NOTE:
Check all the functions that may be used to monitor and make sure that the monitor is in
good status.
NOTE:
If chargeable batteries are provided, charge them after using the monitor every time to
ensure the electric power is enough.
M3 Vital Signs Monitor Service Manual
- 24 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents