Y branch, Header and HR unit connection pattern
Pattern 1
HR1
1
2
48k
48k
• Impossible installation : Head branch pipe
Pattern 3
• The maximum total capacity of indoor
units is 58kW(192 kBtu/h).
Pattern 5
A
1
48k
PIPE CONNECTIONS BETWEEN INDOOR AND OUTDOOR UNIT
B
HR2
3
4
48k
48k
HR unit
HR1
1
2
3
4
48k
48k
48k
48k
HR1
HR2
2
3
4
48k
48k
48k
Pattern 2
HR1
B
1
2
3
7k
7k
7k
• Impossible installation : HR unit
pipe
Y and Head branch pipe.
Pattern 4
1
12k
• The maximum total capacity of a branch
pipe of HR unit is 14.5kW(48 kBtu/h).
Pattern 6
HR1
A
B
1
2
24k
24k
37
A
4
5
6
7
7k
7k
24k
24k
Head branch
HR1
B
2
3
4
12k
12k
12k
A
A
3
4
5
24k
12k
12k

Hide quick links: