Grundfos AQtap Service Instructions With Installation And Operating Instructions page 42

Table of Contents

Advertisement

13. Insert the coil plug.
14. Screw in and tighten the screw to fix the coil plug.
– Torque = 0.6 ±0.2 Nm
Torque [Nm]
0.6 ±0.2
15. Lead the mains supply cable through one of the bigger cable
glands.
42
16. Connect the mains supply cable wires to the new power plug
according to the imprint on the power board, and tighten the
screws.
– Connect phase line (L) to L, neutral line (N) to N and
protective earth (PE) to the middle terminal with earthing
sign.
– Torque = 0.35 ±0.05 Nm
Torque [Nm]
0.35 ±0.05
17. Tighten the cable gland at the power supply unit.
– Torque = 1.0 ±0.1 Nm
Torque [Nm]
1 ±0.1

Advertisement

Table of Contents
loading

Table of Contents