Table of Contents

Advertisement

Quick Links

GRUNDFOS INSTRUCTIONS
AQtap
Water dispenser
Installation and operating instructions

Advertisement

Table of Contents
loading

Summary of Contents for Grundfos AQtap

  • Page 1 GRUNDFOS INSTRUCTIONS AQtap Water dispenser Installation and operating instructions...
  • Page 2: Table Of Contents

    AQtap user interface Storage capacity of smart cards connection, water tapping, Display of large amounts of water credits at the AQtap 15 which only apply to AQtap water 7.10 Water Management System (WMS) Note dispensers.
  • Page 3: Symbols Used In This Document

    Improper use can lead to personal injury! If these safety instructions are • The AQtap dispenser must be not observed, it may result in Caution used with water complying malfunction or damage to the with WHO drinking water equipment.
  • Page 4 The AQtap must be supplied in all poles. with water via a pipe with 1/2" Caution • If an AQtap with grid power inner diameter, not via a hose. supply is connected to an The strainer must be installed in...
  • Page 5 (2006/66/EC). Check the polarity using a The non-rechargeable Lithium battery Caution multimeter before connecting included in the AQtap control unit does not the cables from the solar panels. contain mercury, lead and cadmium. 2.1.3 Handling of batteries Type CR2032, Lithium Battery type •...
  • Page 6: Receiving The Product

    1. Check that the AQtap has not been damaged during transportation. Grundfos company or service workshop. 2. Check that the specifications of the AQtap correspond to the order. See nameplate. 3. Check the scope of delivery. 3.3 Scope of delivery 3.3.1 AQtap...
  • Page 7: Installing The Product

    1. Mechanical installation authorised and qualified staff. 2. Hydraulic installation To open the AQtap, unlock the upper lock with one of the unique 3. SIM card preparation and installation keys and the lower lock with the standard cabinet key. 4. Electrical connection: Grid connection and / or Solar panel 4.5 Mechanical installation...
  • Page 8: Hydraulic Installation

    7.10.5 Operating of offline AQtaps. This manual Note assumes normal operation of AQtaps with The AQtap has an inlet for the connection of a pipe and an outlet connection to WMS. for a hose or a pipe with an external thread of 1/2".
  • Page 9 Check that the supply voltage and frequency correspond to the batteries. values stated in section 13. Technical data and on the nameplate. The AQtap can be operated with grid and / or solar power. The Ensure correct polarity! Caution internal battery is used as a backup power for approximately 12 •...
  • Page 10: Check The Gprs Communication

    4.9 Check the GPRS communication 4.9.2 Abbreviations The SIM card will not be read by the AQtap until it Abbreviation Description was powered off and on again. Communication Interface Module Caution If the SIM card was replaced by a new one, the...
  • Page 11: Complete Installation

    5.2.3 Warnings 1. Warning sign (yellow) and warnings are displayed: 1. Write the SIM card phone number on the back of the AQtap installation and operating instructions. – The last 10 warnings are kept in a log, "1E" is the newest alarm, "10E"...
  • Page 12: Product Introduction

    Water Management System The Water Management System (WMS) is an online platform that monitors and manages connected AQtap water dispensers. Smart cards Smart cards are required for all actions at the AQtap. Four user profiles are available for different actions.
  • Page 13: Applications

    7.1.1 Power supply Other applications or the operation of the AQtap The AQtap can to be operated with grid and / or solar power. It in ambient and operating conditions, which are uses the power supply in the following hierarchy:...
  • Page 14: Aqtap Safety Concept

    • AdminCards and ServiceCards are code-protected. The code Admin Card must be set at the AQtap when the cards are used for the first time. The set code cannot be changed afterwards. • All smart cards can be blocked permanently via WMS.
  • Page 15: Aqtap User Interface

    Place the smart card on the left smart card reader to tap water, receive water credits from another smart card or download water The AQtap can only display the first five digits of a value. credits from WMS. The maximum amount of water credits that can be transferred...
  • Page 16: Water Management System (Wms)

    Setting up the GPRS communication approved payment. Water credits are available at the AQtap. Install the SIM card in the AQtap, see section 4.7 SIM card If the request fails, the mobile bank sends a notification of preparation and installation, and commission the AQtap using the rejected payment.
  • Page 17: Operating The Aqtap By Means Of The Smart Cards

    9.2.3 Downloading water credits to a smart card The water price can be set or changed in the service menu of the AQtap with the ServiceCard. To set or change the water price in If there is no connection, try again later! the service menu see sections 5.2 Service menu, 5.2.4 Water...
  • Page 18: Servicing The Product

    3. Take out the filter and clean it from particles. 10.1.1 Maintenance requirements 4. Reinstall the filter. To maintain the AQtap water dispenser, the service menu must be 5. Screw the end cap onto the strainer. run and the cabinet must be opened. Requirements for maintenance are: 6.
  • Page 19: Replacing The Sim Card

    11.2.1 Entering the service menu 3. Restart the AQtap. 1. Place the ServiceCard on the right smart card reader. If the AQtap still does not operate properly, have the AQtap serviced by a Grundfos SSP (sales and service partner). 2. Enter PIN code.
  • Page 20: Taking The Product Out Of Operation

    12.1 Resetting the product Resetting the AQtap removes it from its WMS group. WMS still tries to receive data from the AQtap and creates alarms until IMEI no. and telephone no. are removed from the AQtap water dispenser in WMS. The logged data are kept.
  • Page 21 Internal (standby) battery Power supply requirements The rechargeable nonspillable AGM lead-acid battery included in the AQtap as a backup battery contains lead, it does not contain • grid power AC connection: mercury and cadmium. 110 - 240 V, 50/60 Hz Power supply •...
  • Page 22 12.2 Taking the product out of operation. The waste batteries should be disposed of through the national collective schemes. If in doubt, contact your local Grundfos company. Use appropriate waste collection services. If this is not possible, contact the nearest Grundfos company or service workshop.
  • Page 23 Phone: +852-27861706 / 27861741 Telefax: +47-22 32 21 50 Canada Telefax: +852-27858664 Turkey Poland GRUNDFOS Canada Inc. GRUNDFOS POMPA San. ve Tic. Ltd. Sti. Hungary 2941 Brighton Road GRUNDFOS Pompy Sp. z o.o. Gebze Organize Sanayi Bölgesi Oakville, Ontario GRUNDFOS Hungária Kft.
  • Page 24 Date of installation: Name of installer: SIMcard telephone company: SIMcard phone no.: Contact information of service technician: 98804958 0715 ECM: 1153873 www.grundfos.com...

Table of Contents