Powering on the switch
Verification before power-on
Before powering on the switch, verify the following items:
•
The power cord is correctly connected.
•
The input power voltage meets the requirement of the switch.
•
The console cable is correctly connected.
•
The terminal (for example, a PC) has started, and its configuration parameters have been
correctly set.
Powering on the switch
Power on the switch (for example, an HPE 1910 24 PoE+ switch), and the following information is
displayed:
Starting......
****************************************************************************
*
*
*
****************************************************************************
Copyright (c) 2010-2013 Hewlett Packard Enterprise Development LP
Compiled Date
CPU Type
CPU L1 Cache
CPU Clock Speed
Memory Type
Memory Size
Memory Speed
BootWare Size
Flash Size
BootWare Validating...
Press Ctrl+B to enter extended boot menu...
Starting to get the main application file--flash:/hpe1910_24_poe.bin!........
..............
The main application file is self-decompressing.............................
............................................................................
............................................................................
............................................................................
............................................................................
............................................................................
............................................................................
............................................................................
HPE 1910 24 PoE+ Switch JG5389 BootWare, Version 1.02
: Mar 20 2013 17:00:53
: MIPS4kec
: 16KB
: 500MHz
: DDR3 SDRAM
: 128MB
: 300MHz
: 3MB
: 32MB
16
*
*
*