INSTALLATION
Commissioning
11. Commissioning
11.1 Initial start-up
f Fill the appliance by running the tap several times until the
f
pipework and appliance are free of air.
f Carry out a tightness check.
f
f Insert the power cable plug, if present, into the standard
f
safety socket or set the fuse/MCB.
f Check the function of the appliance.
f
f In the case of oversink installation, affix the company logo
f
supplied over the existing company logo.
38
| DNM
11.2 Appliance handover
f Explain the appliance function to users and familiarise them
f
with its operation.
f Make users aware of potential dangers, especially the risk of
f
scalding.
f Hand over these instructions.
f
11.3 Recommissioning
Material losses
!
Following an interruption of the water supply, recommis-
sion the appliance by carrying out the following steps,
in order to prevent irreparable damage to the bare wire
heating system.
f Isolate the appliance from the power supply. Pull the power
f
cable plug, if present, from the socket, or remove the fuse/
reset the MCB.
f See chapter "Initial start-up".
f