Sun Microsystems StorEdge D1000 Upgrade Installation Manual page 4

Table of Contents

Advertisement

4. Turn off the power to the system.
Push the power switch to the standby position. Press the left side of the switch.
Note – If you do not turn off the host, you may get error messages such as
SCSI timeout, SCSI reset, ISP reset, or ISP register dump.
5. Remove the SCSI cables and terminator on the controller board.
See the Sun StorEdge A1000 and D1000 Installation, Operations, and Service Manual and
the Sun StorEdge A1000 and D1000 Product Note for more information.
6. Attach an antistatic wrist strap to the exposed metal part of the chassis at the
center post between the power supply bays.
FIGURE 1
7. Slide the canister out and set it on an antistatic mat.
a. Use the levers at each side to release the controller board.
b. Hold the levers to slide the canister out.
2
Sun StorEdge D1000 to A1000 Upgrade • April 1998
Opening the D1000 Canister Latches

Advertisement

Table of Contents
loading

Table of Contents