Garland M60XR Installation, Operation And Maintenance Manual

Garland M60XR Installation, Operation And Maintenance Manual

Infra-red & ceramic broiler master series
Hide thumbs Also See for M60XR:

Advertisement

MASTER SERIES
INFRA-RED & CERAMIC
BROILER
Installation, Operation and Maintenance Manual
This manual is updated as new information and models are released. Visit our website for the latest manual.
Part # 4515576 Rev 1 (01/21/10)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M60XR and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Garland M60XR

  • Page 1 MASTER SERIES INFRA-RED & CERAMIC BROILER Installation, Operation and Maintenance Manual This manual is updated as new information and models are released. Visit our website for the latest manual. Part # 4515576 Rev 1 (01/21/10)
  • Page 2: Important Information

    Users are cautioned that maintenance and repairs must be performed by a Garland authorized service agent using genuine Garland replacement parts. Garland will have no obligation with respect to any product that has been improperly installed, adjusted, operated or not maintained in accordance with national and local codes or installation instructions provided with the product, or any product that has its serial number defaced, obliterated or removed, or which has been modified or repaired using unauthorized parts or by unauthorized service agents.
  • Page 3: Table Of Contents

    TABLE OF CONTENTS IMPORTANT INFORMATION......... . 2 SPECIFICATIONS .
  • Page 4: Specifications

    MANIFOLD Model Broiler Burner Base PRESSURE OPERATING PRESSURE Number Natural Gas: 7” w.c. Natural Gas: 6” w.c. M60XR Cast Iron Burner With Standard Oven Propane: 11” w.c. Propane: 10” w.c. Ceramic Tile M60XRC Cast Iron Burner With Convection Oven Electrical Supply...
  • Page 5: General Information

    2. The wires for retaining the burners and other packing 5. Garland/U.S. Range products are not approved or material must be removed from units. Any protective authorized for home or residential use, but are intended material covering stainless steel parts must also be for commercial applications only.
  • Page 6: Installation

    INSTALLATION Siting Where it is not practical to do this, an automatic isolation valve system shall be fi tted which can be operated from a The fl oor on which the appliance is to be sited must be readily accessible position near to the exit. capable of adequately supporting the weight of the At locations where the manual isolation valve is fi tted or appliance and any ancillary equipment.
  • Page 7: Appliances Equipped With Casters

    INSTALLATION Continued Appliances Equipped With Casters 1. Be sure that all valves and thermostats are in the “OFF” position. 1. The installation shall be made with a connector that 2. Turn on the main gas supply valve. Light all broiler pilots. complies with the Standard for Connectors for Moveable Gas Appliances, ANSI Z21.69/CSA 6.16, Addenda Z21.69B- 3.
  • Page 8 INSTALLATION Continued 1. Place the thermocouple of the test instrument or reliable Indicator Mark mercury thermometer in the center of the oven. Calibration By-pass Flame Plate 2. Turn the oven temperature control knob to 400°F, (204°C), Adjuster and allow the oven to cycle at least three times. Calibration Lock Screws Dial...
  • Page 9: Operation

    10-15 seconds. Infra-Red Burners -M100XM, M110XM 5. The haze will disappear and the ceramics will glow red. The GARLAND® Infra-Red Broiler is a direct radiant heavy Shut-Down: duty gas broiler utilizing four (4) extremely effi cient gas burners in each broiling section.
  • Page 10: Ovens

    OPERATION Continued CAUTION: Should burner ignition fail within 5 seconds, Convection Ovens (RC) turn the burner valve off and repeat steps 1 through 5. If Lighting: ignition continues to fail, consult your factory authorized service agency. Same as standard oven. Ovens Start-Up: Standard Ovens...
  • Page 11: Product Application

    PRODUCT APPLICATION Broiler It is suggested that all products be dipped in salt-free oil before broiling to facilitate browning and to aid in The following information is intended for use as a guide. preventing the product from sticking to the broiler rack. There are many variables that will eff ect the operation.
  • Page 12: Care & Cleaning

    PRODUCT APPLICATION Continued Center the load on the oven racks to allow for proper heat When rethermalizing frozen products, preheat the oven 50°F circulation around the sides. The oven will hold three, 18” x (10°C), higher than the cooking temperature to compensate 26”...
  • Page 13: M110Xm

    CARE & CLEANING Continued Remove and clean the grid rack inserts and grease drip chute Instructions For Removal Of Grid Rack & daily. Pull the grid rack forward and lift the grease rack insert Grid Rack Frame out of the frame. Remove the grease drip chute by pulling it forward out of the rack frame guides.
  • Page 14: Wiring Diagram

    WIRING DIAGRAM Page 14 Part # 4515576 Rev 1 (01/21/10)
  • Page 15 Part # 4515576 Rev 1 (01/21/10) Page 15...
  • Page 16 GARLAND 1177 KAMATO ROAD, MISSISSAUGA, ONTARIO, CANADA, L4W1X4 888-442-7526 WWW.GARLAND-GROUP.COM Every new piece of Manitowoc Foodservice equipment comes with KitchenCare™ and you choose the level of service that meets your operational needs from one restaurant to multiple locations. StarCare – Warranty & lifetime service, certifi ed OEM parts, global parts inventory, performance audited ExtraCare —...

This manual is also suitable for:

M60xsM60xtM100xrM60xrcM100xrcM100xs ... Show all

Table of Contents