Chapter 2 Installing Your Product; Plugging In Signals; Plugging In Main Power; Turning On Your Product - RGBlink VENUS X1PRO User Manual

Hide thumbs Also See for VENUS X1PRO:
Table of Contents

Advertisement

Chapter 2 Installing Your Product

2.1 Plugging in Signals

Connect signals to the product (ensure all devices are powered off first). Tighten connector
screws/locks where provided.
For connector protection and for additional cable support this product is fitted with protection
frames on either side of the device. For cable support use cable ties to attached to the protection
frames to avoid stress on signal connectors.

2.2 Plugging in Main Power

Connect IEC cable to device and plug into wall socket. Turn on power at wall socket.

2.3 Turning on Your Product

Turn the power switch on the rear of the product to the ON position.
OLED display will show as below, completing initialization before loading last settings and
input/output configuration.
On delivery, DP will be the default input signal at 1920x1080x60, and the output format is
defaulted to 1920x1080x60.
VENUS X1PRO
User Manual
13

Advertisement

Table of Contents
loading

Table of Contents