Main Landing Gear & Wheel Pant Installation - AeroWorks EXTRA 260 FREESTYLE QB-L User Manual

52"
Hide thumbs Also See for EXTRA 260 FREESTYLE QB-L:
Table of Contents

Advertisement

MAIN LANDING GEAR AND
WHEEL PANT INSTALLATION
1. Gather the following items shown below for the
main landing gear assembly.
Required Parts
1 - Carbon landing gear strut
2 - 2" Foam Tires
2 - Axles bolts
4 - Lock nuts for axle
2 - 6-32 mounting bolts
2 - 6-32 Flat washers
2 - 1mm Nylon Spacer
2 - Wheel pants
2 - 4-40 Bolts
2 - Flat Washers
2 - Lock Washers
Required Tools and Adhesives
5/64" Ball Driver
7/64" Ball Driver
Pliers
1 - .34oz Bottle Blue IC-Loc Thread Locker
18
2. The tapered edge of the landing gear goes to the
back of the airplane.
Back
Front
3. Attach the landing gear with bolt and flat
washer. Use a drop of blue Loctite on landing
gear bolts before attaching the landing gear.
4. Bolt landing gear strut to fuse with (2) 6-32 bolts
and washers.
5. Slide the axle bolt into the wheel as shown.
52" Aeroworks Extra 260 Freestyle Assembly Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents