Download Print this page

Installation - Sub-Zero UC-15I Installation Manual

Undercounter
Hide thumbs Also See for UC-15I:

Advertisement

IN S TA L L AT I O N

Installation

IN S TA L L I CE M A CHI N E
Adjust the leveling legs close to the desired height. Refer
1
to the illustration below.
Reverse the door swing if needed. Refer to steps out-
2
lined on page 9.
Gravity drain model: Install the drain hose provided,
3
onto the drain fitting on the back of unit and route to
the open site drain. Refer to the illustration below and
plumbing requirements on the previous page.
Drain pump model: Route drain tubing through the drain
fitting on the back of the unit and install the drain hose
provided, on the drain pump. Route the other end of
the drain tubing to the drain site. Refer to the illustration
below and plumbing requirements on the previous page.
Use a compression fitting to connect the water inlet on
4
back of ice machine to the prepared
water line. Refer to the illustration below.
LEVELING
LEG
Leveling.
1
/
" (6) OD cold
4
DRAIN FITTING
WATER INLET
Drain connection.
Open the shut-off valve on the water line. Check all
5
plumbing connections for leaks. Failure to do so could
result in flooding.
Plug the power cord into the grounded receptacle.
6
Level the ice machine to assure the door closes and
7
seals properly. Place a level on top of the unit and turn
each leveling leg to raise or lower as needed.
Move the ice machine into its final position.
8
Anchor the ice machine by installing two flat head
9
screws provided through each hinge. Refer to the illus-
tration below.
ANCHORING
SCREWS
Anchoring.
|
subzero.com
7

Advertisement

loading

This manual is also suitable for:

Uc-15ioUc-15ipoUc 15i