Attaching The Pedestal Kit Top And Bottom - HP Integrity rx2800 i2 Installation Manual

Hide thumbs Also See for Integrity rx2800 i2:
Table of Contents

Advertisement

3.
Repeat these steps for the rail on the other side of the server.
Figure 1 Removing the rails from the server

Attaching the pedestal kit top and bottom

IMPORTANT:
In this document the server top, bottom, right and left refer to the server as faced from the front
with the server in a horizontal orientation. The pedestal kit components are referred to by the final
position with the server in a vertical orientation. For example, the pedestal kit bottom attaches to
the server left side.
Installing the server into a rack or pedestal
7

Advertisement

Table of Contents
loading

Table of Contents