Toro 41188 Operator's Manual page 61

Turf sprayer
Hide thumbs Also See for 41188:
Table of Contents

Advertisement

Installing the Master Boom Manifold
Valve
1. Align the flange of the master boom valve manifold, 1
gasket, and the flange of the master boom bypass valve
(A of
Figure
63).
Figure 63
1. Flange clamp
2. Gasket
3. Manifold (master boom
valve)
4. Flange (bypass —master
boom valve)
5. Flanged-head bolt
2. Assemble the master boom valve manifold, gasket, and
master boom bypass valve with a clamp tightened hand
tight (A of
Figure
63).
3. Align the flange of the master boom valve manifold, 1
gasket, and the agitation valve manifold (B of
63).
4. Assemble the master boom valve manifold, gasket, and
agitation valve manifold with a clamp tightened hand
tight (B of
Figure
63)
5. Align the flange of the master boom valve manifold, 1
gasket, and the 90° flanged elbow (at the end of the
hose for the flow meter; refer to B of
6. Assemble the master boom valve manifold, gasket, and
90° flanged elbow with a clamp tightened hand tight
(B of
Figure
63).
6. Valve mount
7. Flanged locknut
8. Flange (agitation valve)
9. 90° flanged elbow
Figure
Figure
63).
7. Assemble the agitation valve to the valve mount with
the flanged-head bolt and flanged locknut that you
removed in step
Manifold Valve (page
1017 to 1243 N-cm (90 to 110 in-lb).
Installing the Section Manifold Valve
1. Insert the upper endcap fitting of the manifold valve
into the bypass fitting (A of
Note: If needed, loosen the mounting hardware for
the bypass fitting as needed to provide clearance.
1. Flange (reducer coupling)
2. Socket (bypass fitting)
3. Bypass fitting
4. Flange (adjacent
manifold—agitation valve)
5. Endcap fitting (manifold
valve assembly)
2. Secure the endcap fitting to the bypass fitting by
inserting a retainer into the socket of the bypass fitting
(A of
Figure
64).
3. Assemble the outlet fitting onto the lower endcap
fitting of the manifold valve (A of
4. Secure the endcap fitting to the outlet fitting by
inserting a retainer into the socket of the outlet fitting
(A of
Figure
64)
5. Align a 1 gasket between the flanges of the reducer
coupling and the section valve manifold (B of
64).
6. Assemble the reducer coupling, gasket, and section
valve manifold with a clamp tightened hand tight ( B of
Figure
64).
7. If installing the 2 left most section valves, align a 1
gasket between the flanges of the 2 adjacent section
valve manifolds (B of
61
2
of
Removing the Master Boom
55)and torque the nut and bolt to
Figure
64).
Figure 64
6. Socket (outlet fitting)
7. Retainer
8. Flange (manifold—section
valve)
9. Gasket
10. Flange clamp
Figure
64).
Figure
64).
Figure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi pro 1750

Table of Contents