Installing The Handle Assembly - Toro 30436 Operator's Manual

Mid–size mower proline hydro 17 hp with 52 inch side discharge mower
Table of Contents

Advertisement

Step
Description
10
No parts needed
Oil drain hose
Operator's Manual
11
Engine Operator's Manual
Parts Catalog
Registration card
1
St e p
Parts needed for this step:
1 Handle assembly
2 Flange bolts, 3/8 x 1 inch
2 Flange bolts, 3/8 x 1–1/4 inch
4 Flange nuts, 3/8 inch

Installing the Handle Assembly

1. Align handle with upper mounting holes in rear frame
(Fig. 2).
2. Secure the handle at each upper mounting hole with a
flange bolt (3/8 x 1–1/4 inch) and flange nut (Fig. 2).
3. Select the low position for the lower mounting hole
(Fig. 2).
4. Secure the handle at each lower mounting hole with a
flange bolt (3/8 x 1 inch) and flange nut (Fig. 2).
Note: The handle position can be adjusted to match the
operator 's height preference.
Qty.
Use
Setting up the hydro control linkage
1
Use for draining engine oil
1
Read before operating machine
1
Read before operating machine
1
1
Fill out and return to Toro
7
8
9
4
2
6
1. Handle assembly
2. Rear frame
3. Flange nut, 3/8 inch
4. Flange bolt, 3/8 x 1 inch
5. Upper mounting hole
Note: Handle assembly must be installed before fuel tank
is installed.
15
5
1
3
m–6600
Figure 2
6. Lower mounting holes
7. Low position
8. High position
9. Flange bolt, 3/8 x
1–1/4 inch

Advertisement

Table of Contents
loading

Table of Contents